In progress2014 – expected 2029
York, PA
Greens and bunkers
Andrew Green
Described as a restoration by the USGA
Andrew Green's 2014 master plan restores Ross's design from the original drawings. Nine holes were restored over the following ten years and all 59 bunkers by 2022, with more holes to be restored before the 2029 U.S. Women's Mid-Amateur.
Sources: USGA, "Country Club of York to host 2029 U.S. Women's Mid-Amateur, 2035 U.S. Women's Amateur Four-Ball" · Country Club of York, Golf page
In progress2026 – expected 2027
Golf, IL
Greens and tees
Tyler Rae
Described as a renovation by the club
A renovation aimed at returning the course to William Flynn's 1922 redesign. Nine greens are to be relocated, the tees made more flexible, and the West Fork of the North Branch of the Chicago River brought more into play. The club planned to close the course in mid-June 2026 and to reopen it after its caddie program resumes in spring 2027.
Sources: Chicago District Golfer, Around the CDGA: Renovation (April 2026) · Glen View Club, Caddie Information · Tyler J. Rae, Client List
In progress2026 – expected 2026
Belleair, FL
Greens, bunkers, fairways and routing
Fry/Straka, QGS Development (builder)
Described as a renovation by the club
Fry/Straka's full redo of the East, widened in 2022 from a greens, bunkers and fairways brief. Ross's original 17th, a downhill par 3 over the creek, is being restored as the new 18th, so the course will again finish on a par 3.
Sources: Belleair Country Club, About Us (timeline) · Golf Club Atlas forum, "Belleair West" (Cummings, East committee member) · Connor T. Lewis, "We Ended With Threes," The SOCIETY Newsletter #58
In progressSince 2026
Dearborn, MI
Bunkers
Described as a renovation by the club
The club began a bunker renovation in September 2026 and announced the 12th and 13th complete in early October, with work shown on the 5th and 7th. No architect, full scope or finish date has been announced.
Source: Dearborn Country Club, Facebook post on the bunker renovation
In progressSince 2026
Newton, MA
Greens, bunkers and tees
Demolition of the 6th green and construction of a new green complex with surrounds and approaches, with bunker reshaping. The same city bid covers a new 10th tee complex, new walls at the 10th and 7th tees and new cart path at the 10th tee. A temporary green has been in play on the 6th since September 14, 2026.
Sources: Newton Commonwealth Golf Course home page (temporary green on the 6th from Monday September 14) · Newton Commonwealth GC, Instagram · ConstructConnect, Golf Course Improvements Holes 6 Green, 10 Tee and 7 Wall (City of Newton bid 26-42) · ConstructConnect, Golf Course Improvements Holes 6 and 10 (no bids received)
In progress2025 – expected 2026
Wayne, PA
Greens, bunkers, tees and fairways
Tyler Rae, Mottin Construction (builder)
Described as a renovation by the club
Tyler Rae is renovating the course with Mottin Construction as builder, reshaping the greens to recapture Donald Ross's original contours. The greens were seeded in summer 2025, followed by new fairway bunkers, irrigation, seeded fairways, rebuilt tee complexes and new liners and sand in every bunker. The club expects to reopen the course in 2026.
Sources: St. Davids Golf Club, Golf page · St. Davids Golf Club, Club Life page · TeeOff, Saint Davids Golf Club details · St. Davids Golf Club, ChipShots newsletter, Fall 2025 · Tyler J. Rae, Current Projects
In progress2025 – expected 2026
Camden, SC
Greens and bunkers
Scot Sherman, Love Golf Design
Described as a restoration by the ASGCA
Scot Sherman's phased restoration from the club's Travis and Ross sketches restores the greenside bunkers first, then the fairway bunkers, adds wiregrass and broomsedge to the native areas and regrasses the greens last.
Source: ASGCA, "Historic Camden (S.C.) Country Club being restored by Sherman, ASGCA"
In progress2025 – expected 2026
Delray Beach, FL
Greens, bunkers, tees, fairways and routing
Sanford Ferris Golf Design, NMP Golf Construction (builder)
Described as a renovation by the City of Delray Beach
Sanford Ferris is rebuilding the course from Ross's 1925 plans and early aerials, with NMP Golf Construction building. The Ross (south) nine becomes holes 1 to 9 and the Wilson (north) nine 10 to 18.
Sources: WPTV/WFLX, "Delray Beach Golf Club closing for $30 million renovation project" · WPTV/WFLX, "$30M Delray Beach Golf Club renovation on track" · City of Delray Beach, golf course renovation website
In progressExpected 2025
Wayzata, MN
Greens, bunkers, tees, fairways and trees
Anderson Engineering of Minnesota, LLC
Described as a renovation by the club (cover letter to the City of Orono, April 2025: 'Woodhill Country Club Renovation Project'); Wayzata.com (May 2025) called it a 'major course restoration' in its own reporting
New irrigation system, replacement of bunker sand and drainage, minor reshaping of greens and tees for a revised course layout, new teeing grounds, wider fairways and removal of selected trees. A new storm sewer, new cart paths, and two man-made ponds filled; the club's stated aim was to restore the course to Ross's original intent.
Sources: City of Orono Planning Commission agenda packet, item 6.4 (LA25-000013), with Woodhill Country Club cover letter · Anderson Engineering of Minnesota, Stormwater Narrative/Summary, Woodhill CC - Course Renovation Project (MCWD permit 25-100) · Wayzata.com, Wayzata City Council Workshop Tackles Staffing, Sustainability, and Tree Policy Reform · Wayzata.com, Wayzata Grants Full Tree Ordinance Exemption to Golf Courses
In progressSince 2025
Rochester, NY
Course work
Monroe County began a drainage improvement project in September 2025 that also changes some yardages and pars. Cart paths and earlier drainage work were completed in 2024.
Source: Monroe County, "County Executive Adam Bello Announces Drainage Improvements At Durand Eastman Golf Course"
In progressSince 2025
Thendara, NY
Trees
Thendara Golf Club greens committee and grounds staff (in house) (in-house)
In-house tree removal across several holes, run by the club's superintendent and grounds staff. The greens committee says it is needed because tree growth has changed the original hole designs. Work on the 3rd and 18th was being cleaned up by May 2025, and the 5th and 12th were cleared over winter 2025-26; more was planned right of the 13th green and along the 16th.
Sources: Thendara Golf Club Board of Directors minutes, May 2, 2025 · Thendara Golf Club Board of Directors minutes, July 10, 2025 · Thendara Golf Club Board of Directors minutes, October 23, 2025 · Thendara Golf Club Board of Directors minutes, May 7, 2026
In progress2016 – expected 2023
Bedford, NH
Bunkers, tees and trees
Ron Forse of Forse Design, MCC's director of agronomy (in-house)
Described as a restoration by the club
A long-range plan by Ron Forse, adopted in 2006, to return the course to Ross's original intent and modernise its length. Field work began in 2016 and has included large-scale tree removal, a new championship tee set and the return of cross bunkers and fescue mounds. The club says the programme continues.
Sources: Manchester Country Club, Centennial history timeline · Manchester Country Club, Golf page · New Hampshire Business Review, "Teeing up a transformation" · The Golf Wire (NHGA release), "New Hampshire Tournaments Returning to Manchester Country Club"
In progressSince 2022
Augusta, GA
Greens and bunkers
Tripp Davis
Described as a renovation by Golf Digest
Tripp Davis's multi-year master plan began in 2022 by converting the greens from bentgrass to TifEagle Bermuda and restoring the greenside bunkers and their lips.
Sources: Stan Awtrey, "A Classic Returns," Golf Georgia · Golf Digest, Augusta Country Club course page
In progressSince 2022
Concord, MA
Greens, bunkers, tees, fairways and trees
Andrew Green, Peter Rappoccio (in-house)
Andrew Green succeeded Ron Prichard. His 2022 master plan called for a rebuilt 10th green, a new back tee on the 11th, a rebuild of the 14th, later work on the 5th and 6th, and bunker and green-expansion work in 2025. In-house work has removed trees and added more than four acres of fairway.
Source: Mass Golf, "Continuous Improvement Is The Norm For Concord Country Club"
In progressSince 2022
Worcester, MA
Greens, bunkers, fairways and trees
Matthew Dusenbery, Bradley Klein (consultant), Craig Resley (in-house), Nick Campanelli
Described as a restoration by Mass Golf ("restore Ross elements"; "master plan and restoration")
A phased master plan by Matthew Dusenbery with Bradley Klein, working from 1934, 1948 and 1960 aerials. Work has included tree removal, fairway widening, green expansions and reintroducing the deep approach bunker on the 4th, with the 4th green's entrance opened and the approach bunker repositioned in April 2022. Klein now lists the master plan restoration with architect Nick Campanelli.
Sources: Mass Golf, Member Clubs Celebrate 125 Years: Tatnuck Country Club · Mass Golf, Tatnuck Country Club Added to 2024 Member Days Schedule · Bradley Klein, Design (current and previous projects)
In progressSince 2021
Orono, ME
Bunkers
Resurrection Golf (in-house)
Described as a restoration by Mainebiz, reporting Resurrection Golf's plans
Bunker restoration started in 2021 under Resurrection Golf and was to continue over the following few years. No later report of its progress or completion was found, and the club has changed hands twice since.
Source: Mainebiz, Bangor businessman buys Orono golf course
In progressSince 2020
Tenafly, NJ
Greens, bunkers and trees
Jaeger Kovich, Kyle Hillegass (in-house)
Master plan by architect Jaeger Kovich, carried out with superintendent Kyle Hillegass, both hired in 2020. Work began with tree and underbrush removal; by late 2024 about a third of the course had been updated, including enlarging the 6th green from 4,550 to 6,900 sq ft with a new rear-right section and bunker. The club says the plan will be executed over the coming years.
Sources: M. James Ward, "Grade A Architecture: Knickerbocker Country Club", Golf Today · Knickerbocker Country Club, Golf page
In progressSince 2018
Savannah, GA
Greens, bunkers, tees, fairways, trees and routing
Gil Hanse, Hanse Golf Course Design
Described as a restoration by the club and the architect
A Ross master plan with notes for all 18 holes covering tees, bunkers, green expansion, tree work and sandy scrub areas. It replaced the former par-3 7th and par-5 8th with a new par-4 7th across the old driving range and a new par-3 8th over a new lake to the old 8th green, and moved the practice range.
Sources: Hanse Golf Course Design, Restoration Projects · Savannah Golf Club master plan (Hanse Golf Course Design) · Savannah Golf Club, Course Restoration page · Sports Illustrated, Dave Seanor (Hanse modifications 2021)
In progressSince 2015
Kenosha, WI
Greens, bunkers, tees, fairways and trees
Drew Rogers, JDR Design Group, Paul Bastron, superintendent (in-house), Harrison Beal, superintendent (in-house)
Described as a restoration by the club (Rogers and Golf Course Architecture call it a design reinstatement)
A phased program begun in 2015 to recover Ross's design: tree removal to reopen corridors, fairway and approach realignment, expansion of all 18 greens toward their original edges (regrassed to bentgrass), 27 new tees, 33 bunkers reinstalled, fescue on hillsides, new irrigation and rebuilt Pike River bridges. The club lists remaining tee work on six holes, cart paths and one recontoured hill in 2021.
Sources: Kenosha Country Club, Course Restoration · Golf Course Architecture, "Drew Rogers to lead design reinstatement project at Kenosha CC" · ASGCA, "Ross-designed Kenosha CC being renovated by Rogers, ASGCA" · Golf Course Architecture, "Rogers recovers Donald Ross's work as Kenosha renovation enters tenth year" · J. Drew Rogers, Kenosha Country Club project page
In progressSince 2014
Cohasset, MA
Greens, bunkers, tees and trees
Ron Forse
Described as a restoration by the club
Ron Forse's work from 2014 rebuilt the 12th green along its original shape and contour and modified two severely sloped greens for modern speeds. The club plans to rebuild the remaining bunkers, reinstall Ross's bunkers, rebuild and add tees and finish its tree plan.
Source: Cohasset Golf Club, Course Tour
In progressSince 2009
Winnipeg, MB
Greens, bunkers, tees and trees
Ron Prichard, Dan Philcox (builder), Riley Johns (associate)
Described as a restoration by the club
The club has followed Ron Prichard's 2004 master plan since contractor Dan Philcox started in 2009: by late 2011 five holes were restored (19 new bunkers, four greens expanded, more than 800 trees cut). Philcox and Riley Johns restored the 16th and 18th green complexes in 2016, and the 17th and 18th were restored in the falls of 2023 and 2024.
Sources: Myron Love, "Elmhurst aims to recapture its original look," Turf & Rec · Elmhurst Golf & Country Club, Golf
In progressSince 2009
Groton, CT
Bunkers
Eric Morrison, CGCS (in-house)
Described as a renovation by TurfNet
A gradual, in-house renovation the course has carried out since 2009, in which many of its more than 100 bunkers are being renovated for the first time. TurfNet says it is paid for with non-traditional financing within a municipal setting.
Source: TurfNet, Ongoing Renovation of Shennecossett Golf Course (podcast)
In progressSince 2008
Plymouth, MA
Fairways and trees
Ian Andrew
Described as a restoration by Mass Golf ('long term restoration process'); the club calls it a 'restoration and revitalization plan'
A long-term restoration program overseen by Ian Andrew from 2008. Andrew described it in 2010 as '90% changing the grass lines and removing the trees', with Bruce Hepner's work at Essex County Club as the model. Mass Golf described the club as still in the midst of the process in August 2021.
Sources: Mass Golf, 118th Massachusetts Women's Amateur Fact Sheet · Golf Club Atlas, 'Get To Know Ian Andrew' (Andrew's replies) · Plymouth Country Club, About
In progressSince 2007
Manchester-by-the-Sea, MA
Greens, bunkers, tees and trees
Bruce Hepner, Eric Richardson (in-house)
Described as a restoration by Mass Golf
Bruce Hepner's master plan, adopted in 2002, has been carried out in stages since October 2007: about 600 trees removed, bunkers renovated, tees rebuilt and greens mowed back out to their original lines. The superintendent estimated it at about 60 percent complete in 2023.
Sources: Eric Richardson, "Essex County Club to Host the 2010 Curtis Cup," GCSANE newsletter · Mass Golf, "Preview: 115th Massachusetts Amateur Championship" · Mass Golfer, "A New Course Every Year"
In progressSince 2003
Hyde Park, MA
Greens, bunkers, tees and trees
Mark Mungeam, Len Curtin (in-house)
Described as a restoration by The Fried Egg
A long-running, piecemeal program by superintendent Len Curtin with architect Mark Mungeam, funded from course revenue. Greens were expanded to recover original outlines and false fronts, trees were cleared around several greens, turf on tees and fairways was restored, and bunkers were added for the modern ball; the 17th was under renovation in 2018. The Fried Egg (2024) describes it as unfinished, with large-scale tree removal still to come.
Sources: Golf Club Atlas, Ran Morrissett, 'George Wright' · Bradley S. Klein, Golf Advisor · The Fried Egg, Garrett Morrison
In progress
Sewickley, PA
Greens, bunkers and trees
Gil Hanse
Described as a restoration by KDKA/CBS Pittsburgh
Gil Hanse's restoration has reworked bunkers and removed trees (the 3rd by 2024, the 17th and 18th by 2026) and rebuilt the 12th with a new green and more of a dogleg, removing its left fairway bunkers.
Sources: KDKA/CBS Pittsburgh, "Allegheny Country Club's 3rd hole has withstood the test of time" · KDKA/CBS Pittsburgh, "Allegheny Country Club's 12th hole has been rebuilt and is more difficult now"
In progress
Rochester, NY
Greens, bunkers, fairways and trees
Barry Jordan, MAS Golf Construction (builder)
Described as a restoration by Golf Course Architecture
Barry Jordan's masterplan, approved in 2022 and built on Ross's routing blueprint, hole sheets, green sheets and photographs, removes 18 bunkers, restores 44 and adds 57, expands greens and fairways, removes trees and rebuilds the 5th, 9th and 18th greens to Ross's sheets. The first phase reinstated bunkers on the 8th, 14th and 15th; the second began in spring 2024.
Source: Richard Humphreys, "Barry Jordan to continue Ross restoration at Brook-Lea in spring 2024," Golf Course Architecture
In progress
Longmeadow, MA
Bunkers, fairways and trees
Tyler Rae (consultant)
Described as a restoration by Top100GolfCourses reviewer Andy Cocker (2026), who says the plan will "preserve or restore key Ross elements"; The Fried Egg calls it a master plan
Tyler Rae, the club's consulting architect since 2024, is carrying out a master plan that builds on Ron Prichard's 1999 restoration plan. A 2026 review says he has used 1934 aerial photographs to rebuild, restore and reposition bunkering, with tree clearance and fairway widening (including on the 2nd) part of the plan. The same review says much of the plan was still to be done after two years.
Sources: The Fried Egg, Design Notebook (Garrett Morrison): Rae "methodically crafting" a Longmeadow master plan · Top100GolfCourses, review by Andy Cocker
In progress
Watertown, MA
Course work
Described as a restoration by the club
The club says it is implementing a master plan that aims to restore many of the original Ross features and improve the course's playability. No architect, scope, schedule or affected holes have been published.
Source: Oakley Country Club, Golf
In progress
Edison, NJ
Trees
Gil Hanse
A second master plan drawn by Gil Hanse in 2014 and carried out under superintendent direction; Golf Course Industry reported in May 2021 that its final items were nearing completion, with work including removal of non-native white pines. No later report says it was finished.
Source: Golf Course Industry, "It just oozes history"
In progress
Rothesay, NB
Greens, bunkers, tees and trees
Ron Pritchard
Described as a restoration by the club ("Golf Course Restoration and Master Plan")
Phased implementation of a restoration master plan by Ron Prichard, one or two holes a year: bunkers upgraded, some new tees, several greens rebuilt and tree clearance. About one-quarter complete after the 2017 season (4th and 8th the most recent holes finished) and about two-thirds complete in summer 2020.
Sources: Top100GolfCourses, Riverside Country Club (New Brunswick) · Riverside Country Club, Golf Course Restoration and Master Plan · Riverside Country Club, Greens & Grounds
In progress
Redford, MI
Course work
Andrew Green of A.H. Green Design
Described as a restoration by the club
The club lists an extensive golf course restoration, guided by Andrew Green of A.H. Green Design, among its recent improvements. It has not published the scope, cost or a completion date.
Source: Western Golf & Country Club, "About WGCC"
AnnouncedExpected 2028
Asheville, NC
Greens, bunkers, tees and fairways
Forse Golf Design, Biohabitats, Cutlip Golf Design (associate)
Described as a restoration by the City of Asheville
Hurricane Helene submerged the front nine in September 2024. The city's design team is restoring it largely to its pre-storm state with added flood resilience; construction is scheduled for 2027 and 2028.
Sources: City of Asheville, "Municipal Golf Course Front 9 Restoration" · John Boyle, "Answer Man," Asheville Watchdog
AnnouncedExpected 2028
Canton, OH
Greens, bunkers, fairways and trees
Tyler Rae, NMP Golf Construction (builder)
Described as a restoration by the club
Tyler Rae's Phase 1 rebuilds the green complexes at the 6th, 12th, 14th and 16th, expands the other greens toward their original sizes, rebuilds the bunkers, widens fairways, removes trees and regrasses. The course closes in summer 2027 and reopens in 2028.
Sources: Brookside Country Club membership site, The Restoration · Glen Turk, "Brookside Country Club Taps Tyler Rae to Restore Its Prime Era Donald Ross Layout," Midwest Golfing Magazine
AnnouncedExpected 2028
Granville, OH
Greens, bunkers, tees, fairways, trees and routing
Hanse Golf Course Design, Gil Hanse
Described as a restoration by Denison University ('renovated and restored'); Hanse Golf Course Design lists it under Course Restoration; The Reporting Project uses both restoration and renovation
Phase 1 of Hanse Golf Course Design's master plan. On holes 1-13: new drainage mains, irrigation improvements, regrassing of fairways and greens, restored fairway widths and, as funding allows, select historic fairway bunkers. On holes 14-18: grading, new greens, tees, fairways, bunkers and corridors, with today's 16th and 17th combined into one par 5. About 362 trees are removed across the course.
Sources: Denison University, Golf Course Renovation · The Reporting Project, 'Plans for an $8 million restoration of the Denison golf course...' · The Reporting Project, 'Township trustees OK proposal for $8 million renovation...' · Hanse Golf Course Design, Restoration Projects
AnnouncedExpected 2027
Highland Park, IL
Course work
Andrew Green
A July 2026 Golf Club Atlas post reported that Andrew Green had recently worked at the club and that work on the whole course was planned for the 2026-27 off-season. No scope has been published.
Source: Golf Club Atlas, "Hidden in Plain Sight---Exmoor in suburban Chicago"
AnnouncedExpected 2027
Highlands, NC
Tees
Ron Forse
The forward (4) tees are to be rebuilt on a sand rootzone this winter, and many enlarged, after a site review with Ron Forse in October 2026.
Source: Highlands CC Agronomy Blog, 'Architect Visit'
AnnouncedExpected 2027
Durham, NC
Greens, bunkers, tees and fairways
Kris Spence
Described as a restoration by the club's management company (Bobby Jones Links release) and the club's job posting ('2027 Donald Ross Golf Course Restoration')
Restoration of the greens and tees and renovation of the bunkers, with new irrigation and drainage. Fairways convert to Zeon zoysia and greens to TifEagle. The course is to close for about ten months.
Sources: Bobby Jones Links release, 'Hope Valley Country Club names Aaron James general manager' (The First Call) · Donald Ross Society news post · PGA job posting, Head Golf Professional, Hope Valley Country Club
AnnouncedExpected 2027
Charlotte, NC
Greens
Andrew Green
Described as a renovation by Two Down Press
The course is to close in December 2026 for new putting greens and irrigation, with Andrew Green making minor architectural changes alongside that work. Reopening is expected in fall 2027.
Sources: Two Down Press, Renovation Roundup · Golf Club Atlas forum, Andrew Green thread
AnnouncedExpected 2027
Juno Beach, FL
Course work
Golf Course Architecture reports plans for a third phase in summer 2027 involving some tweaks and refinements after the 2025-26 restoration. No scope or holes have been published.
Source: Golf Course Architecture, Seminole: Bearing fruit
AnnouncedExpected 2026
Linville, NC
Greens and fairways
Andrew Green
Described as a restoration by PineStraw Magazine ("a more extensive restoration of the 17th hole")
A more extensive restoration of the 17th to adjust its fairway and green elevations, planned for the 2025-26 off-season. No report of its completion was found.
Source: PineStraw Magazine, Lee Pace, "Golftown Journal"
AnnouncedExpected 2026
Winchester, MA
Course work
Andrew Green
Described as a renovation by the club (job postings)
A course-wide renovation by Andrew Green, following an updated master plan, planned to start on 3 August 2026 and finish in fall 2026. No report of the work starting was found by 2026-11-09.
Sources: Winchester Country Club, job posting 'Long Term - Seasonal Grounds Keeper Position' (Dice) · Winchester Country Club, TurfNet job posting 'Seasonal Internship 2026 - Mass Amateur - Course Renovation', via Ground News
AnnouncedExpected 2025
Kenosha, WI
Greens
Drew Rogers
Rogers announced delicate surface work on the 13th and 17th greens, which supported only one or two hole locations, to make more of each surface usable.
Sources: Golf Course Architecture, "Rogers recovers Donald Ross's work as Kenosha renovation enters tenth year" · ASGCA, "Rogers, ASGCA continues renovation of Donald Ross-designed Kenosha Country Club"
AnnouncedExpected 2025
Linville, NC
Greens
Andrew Green
Described as a restoration by PineStraw Magazine
Second phase of Green's restoration: ten more holes, with a doubled construction crew, over the 2024-25 off-season. No report of its completion was found.
Source: PineStraw Magazine, Lee Pace, "Golftown Journal"
AnnouncedExpected 2024
Worcester, MA
Tees
Tee reconstruction at the 7th, to follow pond dredging. Klein described it as the only work left from the restoration, scheduled for later in 2024; no source confirms it was done.
Source: Bradley S. Klein, The First Call
Announced
Bradenton, FL
Course work
Brandon Johnson
Described as a restoration by Golf Course Industry
The club is working with architect Brandon Johnson on a restoration toward Ross's original vision; his recommendations were expected later in 2026.
Source: Golf Course Industry, "Bradenton Country Club restoring 102-year-old Donald Ross design"
Announced
Southbridge, MA
Greens and bunkers
Tim Lewis, Frank Kulig (in-house)
Described as a restoration by Golf Course Architecture
Tim Lewis's plan, from the original drawings and a 1938 aerial, returns the greens toward larger square shapes, restores the 1st green's original orientation and size and removes the two greenside bunkers at the 4th. Holes 1 to 4 come first, then 6 to 9, with much of the work done in-house.
Sources: Mark Wagner, "A masterplan of masters' plans," Golf Course Architecture · Mass Golf, "A New Era at Cohasse Country Club"
Announced
Detroit, MI
Greens, bunkers and tees
Tyler Rae
Described as a restoration by the club
Tyler Rae's restorative master plan, approved by members in March 2024, uses the 1914 Ross plan, early aerials and ground photographs. The South's full renovation follows the North's and was reported as planned for 2028 or 2029; it removes the pond left of the 12th and rebuilds the 13th and 17th tees.
Sources: Detroit Golf Club, "Restorative Master Plan - June 2025" · Rocket Classic, "Detroit Golf Club's $16 Million Restoration Sets the Stage for an Elevated 2026 Rocket Classic"
Announced
Verona, PA
Greens and bunkers
Described as a restoration by the club (part of its "multi-year restoration")
The club says it will rebuild all of its bunkers and "will be looking to expand" its greens back to their original size "over the next several years". No start or completion has been reported.
Source: Green Oaks Country Club, Golf page (History of Green Oaks)
Announced
Jacksonville, FL
Greens, bunkers, tees and fairways
Jay Smith
Described as a renovation by Golf Course Architecture (Richard Humphreys), in its report on Jay Smith's plan
Planned renovation phased over three years, six holes at a time, mainly of greens and bunkers, with minor fairway and tee work and new native areas. Green lines were to be restored from a 1943 aerial and the bunker count reduced. The first phase funded a new irrigation system (MacCurrach Golf Construction), under way in March 2021 alongside clearing and mow-line adjustments; no completion of the green and bunker phases has been reported.
Source: Golf Course Architecture, 'Jay Smith leads research and renovation work at Florida's Hyde Park'
Announced
Erie, PA
Greens
Kris Spence
Described as a restoration by Kris Spence Golf Design
Kris Spence's restoration master plan for the course includes a greens restoration, which his firm lists for fall 2026. It follows the 2023 bunker restoration.
Source: Kris Spence Golf Design, Future, Current & Recent Projects
Announced
West Caldwell, NJ
Greens
Andrew Green, of A.H. Green Design/Green Golf & Turf, Inc.
Described as a restoration by the club (press release)
Andrew Green was appointed restoration architect in March 2022 to evaluate plans and refine select holes and putting surfaces when the club judges the timing right. The Fried Egg (2026) credits a 2023 Green restoration, but no scope or dates were found.
Sources: The First Call (Hunter PR release), Mountain Ridge Country Club engages Andrew Green as restoration architect · The Fried Egg, Mountain Ridge Country Club
Announced
Newport, RI
Greens
Gil Hanse (consultant)
Described as a restoration by the club
Gil Hanse suggested restoring the club's greens to their original size. The club said the restoration would start after 2020. No source read reports it under way or finished.
Source: Newport Country Club, Our History
Announced
San Mateo, CA
Greens and bunkers
Tyler Rae
The club is preparing an updated golf course master plan with Tyler Rae, who lists Peninsula among his current projects. The planned work would replace key course infrastructure, including the irrigation system, greens and bunkers. No construction dates have been announced.
Sources: Conner Penfold, Top100GolfCourses review · GCSAA Career Center, Golf Course Superintendent posting · Tyler J. Rae, Current Projects
Announced
Reidsville, NC
Bunkers
Described as a renovation by Triad Golf
Announced with the January 2026 sale of the club to Tom Holderby, the renovation plans include improvements to bunkers (and cart paths, which do not count as course work here). No architect, scope by hole or schedule has been reported.
Source: Triad Golf, Triad club sold to businessman with local ties
Announced
Philadelphia, PA
Course work
Andrew Green
Described as a restoration by the club
The club hired Andrew Green in 2022 to restore the course to its Donald Ross roots. No scope or schedule has been published; the club says the restoration will come in the coming years.
Sources: The Union League, Golf history timeline (2022) · The Union League, Torresdale page · The First Call, Andrew Green adds to renovation portfolio
Announced
Weston, MA
Course work
Keith Foster, Kevin Hargrave (associate)
Described as a renovation by Kevin Hargrave Golf Course Architect
Keith Foster, with his design associate Kevin Hargrave, has a renovation planned for the course. Construction documents were completed in 2024, and the work is scheduled for summer and fall 2026. The scope has not been published.
Source: Kevin H. Hargrave, Current Projects & Completed Master Plans
Announced
New Bedford, MA
Routing
Proposed sale of about 95 acres of the course to Charter Development for an advanced manufacturing campus requires the city to move holes and rebuild part of the course on the remaining land. The January 2025 plan kept 18 holes with three moved; Bay State Golf reported in March 2026 that holes 1, 2 and 3 and the driving range are affected, the course would run as nine holes during construction, and an 18-hole rebuild would follow.
Sources: Bay State Golf, "Massachusetts Golf Course News: 2026 Winter Roundup" · WBSM, "New Bedford Golf Course Redevelopment Requires Full Hathaway Road Traffic Study" · The New Bedford Light, "New pitch for business park at Whaling City Golf Course"
Announced
Osterville, MA
Bunkers and trees
Hanse Golf Course Design (consultant)
Described as a renovation by Mass Golf ('with the 5th next in line')
Mass Golf reported in June 2025 that the 5th was next in line for the same bunker renovation and tree removal programme. No start or completion date has been published.
Sources: Mass Golf, "Women's Stroke Play Championship: 75th Playing Of Baker Trophy Returns To Breezy Seaside Setting At Wianno Club" · Hanse Golf Course Design, Restoration Projects
Announced
Boston, MA
Bunkers
Described as a renovation by City of Boston bid listing title ('Bunker Renovation')
The Boston Parks and Recreation Department sought bids for a bunker renovation at the course. The listing page is no longer online, and no award, construction dates or hole list were found.
Source: City of Boston bid listing, William Devine Golf Course Bunker Renovation (now 404; title seen in search results, date not confirmed)
Announced
Boston, MA
Course work
The Boston Parks and Recreation Department invited bids for 'William Devine Golf Course Improvements', with bids opened on 27 August 2026. The listing does not describe the work, and no award or start date was found.
Source: City of Boston bid listing, William Devine Golf Course Improvements
Announced
Westerly, RI
Course work
Nicklaus Design, Chad Goetz, Senior Design Associate for Nicklaus Design, The Donald Ross Society (consultant), Winnapaug Superintendent James Trichter (in-house)
Described as a restoration by Nicklaus Design's April 2022 announcement (Golf Course Architecture called it a modernisation and renovation)
Nicklaus Design was appointed to restore and modernise the Ross course in a multi-year partnership with the owners, working with the Donald Ross Society. Construction was expected to begin in October 2022 and continue over the winters for two to three years. No published source gives the holes or features involved, or confirms that work began.
Sources: The Golf Wire (Nicklaus Design release) · Golf Course Architecture · Winnapaug Country Club, Restoration Progress
Completed2025–2026
Juno Beach, FL
Greens, bunkers, tees, fairways and trees
Gil Hanse, Jim Wagner, LaBar Golf Renovations (builder), Caveman Construction (builder), Leibold Irrigation Company, Nelson Caron (in-house)
Described as a restoration by Golf Course Architecture
Gil Hanse and Jim Wagner rebuilt and enlarged every green to Ross's 1929 plan, checked against a 1930 aerial and cores of the old greens, and rebuilt every bunker; front nine in 2025, back nine in 2026. Low ground was sand-capped (17,000 tons front, 50,000 tons back), with new drainage, irrigation and rebuilt ponds; the 12th's ditch was removed and the 15th's mid-fairway bunkers rebuilt as seven. The full course was scheduled to reopen on 31 October 2026.
Sources: Golf Course Architecture, Seminole: Bearing fruit · Golf Course Architecture, Seminole: Keeping pace with change · Donald Ross Society, Restoring Donald Ross's Seminole Golf Club
Completed2025–2026
Cincinnati, OH
Greens, bunkers, tees, fairways and trees
Tyler Rae, Jim Ryan Jr. (associate), Matt Fauerbach (associate), McDonald & Sons (builder), Golf Preservations, Pat O'Brien, Grounds Superintendent (in-house)
Described as a restoration by the club and the Cincinnati Business Courier
Greens expanded on 15 holes (more than 12,000 sq ft), greens 3, 14 and 15 rebuilt to Ross's drawings, all greens and approaches regrassed to 007XL bentgrass, bunkers rebuilt, fairways widened and moved toward the ravines on 8 and 13, hummocks restored, new tees, irrigation and drainage, and hundreds of trees removed.
Sources: Cincinnati Business Courier via Local 12, 2024 plan · Cincinnati Business Courier via Local 12, completion · Hyde Park G&CC Grounds blog, "The Heart of the Restoration-The Putting Greens" · Hyde Park G&CC Grounds blog, "43 Days In- Restoration in Motion" · Hyde Park G&CC Grounds blog, "Thank-You, Hyde Park" · Hyde Park G&CC Grounds blog, "Restoration Update: Addressing Infrastructure Below the Surface"
Completed2024–2026
Lovell, ME
Tees
Lake Kezar Country Club staff (in-house)
A tee program enlarged the 1st tee (2024), added two tee boxes on the 16th (2025), and expanded the 8th, 3rd and 2nd tees over the 2025-26 off-season; the new tees were sodded by June 2026.
Sources: Lake Kezar Country Club, President's Blog June 2024 · Lake Kezar Country Club, President's Blog May 2025 · Lake Kezar Country Club, President's Blog December 2025 · Lake Kezar Country Club, President's Blog February 2026 · Lake Kezar Country Club, President's Blog June 2026
Completed2024–2026
Lovell, ME
Tees
Lake Kezar Country Club staff (in-house)
A tee program enlarged the 1st tee (2024), added two tee boxes on the 16th (2025), and expanded the 8th, 3rd and 2nd tees over the 2025-26 off-season; the new tees were sodded by June 2026.
Sources: Lake Kezar Country Club, President's Blog June 2024 · Lake Kezar Country Club, President's Blog May 2025 · Lake Kezar Country Club, President's Blog December 2025 · Lake Kezar Country Club, President's Blog February 2026 · Lake Kezar Country Club, President's Blog June 2026
Completed2026
Oconomowoc, WI
Bunkers
Rich Mandell, Hollembeak construction (builder)
Described as a renovation by the club (Greens and Grounds blog)
Front-nine phase of the bunker renovation, starting with the 2nd and 6th green bunkers in early April 2026; new bunker complexes were shaped, lined, sanded and sodded with bluegrass, with Mandell on site to mark bunker lines. Spoil was shaped into naturalised areas between the 5th and 7th and right of the 9th.
Sources: OGC Greens and Grounds blog, 'Bunker Update' · OGC Greens and Grounds blog, 'Course updates and 18 hole course opening'
Completed2025–2026
Oconomowoc, WI
Greens and bunkers
Rich Mandell
Described as a renovation by the club (Greens and Grounds blog)
Back-nine phase of the club's bunker renovation: bunkers rebuilt with liners and new sand and their banks sodded, with an expansion of the 10th green. Fairways 14 and 15 were reseeded afterwards.
Sources: OGC Greens and Grounds blog, 'April Update' · OGC Greens and Grounds blog, 'What is happening on 10 green?' · OGC Greens and Grounds blog, 'What's up with those Fairways?'
Completed2026
Charlotte, NC
Greens, bunkers, tees and trees
Andrew Green
Described as a restoration by Golfdom
Andrew Green's complete restoration of the course and practice facility, guided by a 1938 aerial: new irrigation, new grasses and heating and cooling under the greens; holes 14 to 18 reworked, with the 15th and 16th greens moved back and left and the 16th a par 5 again (par 72); new tees on the 11th and 17th; and wide tree removal.
Sources: Sydney Fischer, "Charlotte CC to host two future USGA Championships," Golfdom · Two Down Press, "Renovation roundup: spending spree continues at Charlotte clubs" · Golf Club Atlas forum, "Charlotte's Private Club Scene" · Two Down Press, "Charlotte Country Club Reopens: 3 Notable Changes from Andrew Green's Ross Renovation" · Chuck Milteer, "Tee it up: Anderson native to be director of golf at Kawonu Club," Greenville News
Completed2025–2026
Detroit, MI
Greens, bunkers, tees, fairways and trees
Tyler Rae
Described as a restoration by the club
Tyler Rae rebuilt every green to its original scale using the 1914 plan and early photographs, moving several (the 3rd, 5th, 9th, 15th, 16th, 17th and 18th), rebuilt the bunkers in a high-flashed 1920s style, recut the ditches, removed the 14th's pond, thinned trees, widened fairways and added tees.
Sources: Golf Course Architecture, Detroit's North course ready to reopen in time for PGA Tour's Rocket Classic · Rocket Classic, "Detroit Golf Club's $16 Million Restoration Sets the Stage for an Elevated 2026 Rocket Classic" · Detroit Golf Club, Restorative Master Plan - June 2025
Completed2026
Lovell, ME
Bunkers
Lake Kezar Country Club staff (in-house)
The club built a large new bunker (the president's "giant sandtrap") at the 1st green; the April 2026 post describes it as being finished up. The post does not say whether the green itself changed.
Source: Lake Kezar Country Club, President's Blog April 2026
Completed2026
Lovell, ME
Bunkers
Lake Kezar Country Club staff (in-house)
The club built a large new bunker (the president's "giant sandtrap") at the 1st green; the April 2026 post describes it as being finished up. The post does not say whether the green itself changed.
Source: Lake Kezar Country Club, President's Blog April 2026
Completed2018–2026
Denver, CO
Course work
Denver Golf drained a pond on the 10th fairway, repaired fairway damaged by lake flooding with sod and filled the pond in. The city's photos are captioned 'Lake Drainage' (March 2018), 'Sod Repair' (June 2019) and 'Pond Filled In' (June 2021); the page gives a fall 2018 start and lists the project as completed in 2026.
Source: Denver Golf, Capital Improvements: #10 Fairway Pond Drain and Sod Repair
Completed2025
Tampa, FL
Greens, bunkers, tees and trees
Bobby Weed Golf Design, Joey Graziani (associate), Duininck Golf (builder), Carson Kamps, superintendent (in-house)
Described as a renovation by Duininck Golf ('full 18-hole renovation'); Bobby Weed Golf Design calls it the phase II modernization
Wall-to-wall regrassing (TifEagle greens, TifGrand tees, collars and approaches), all greens stripped and restored with two new green complexes, and all bunkers rebuilt. The 18th green was lowered 2.5 feet and moved right against a new bulkhead; the 4th's tee, lake, bulkhead and green and the 15th's green and bulkhead were rebuilt, and fairway bunkers redone on 7, 10 and 12. Par-3 tees enlarged, forward tees added, lagoons dredged, bulkheads and cart paths rebuilt.
Sources: Bobby Weed Golf Design, Bobby Weed successfully completes second phase renovation of Palma Ceia G&CC · Duininck Golf, Palma Ceia project page · Club + Resort Business, Palma Ceia Completes Phase II Modernization · Donald Ross Society, Palma Ceia wraps up Phase II renovation with Weed
Completed2024–2025
Lovell, ME
Greens
Lake Kezar Country Club staff (in-house)
The 3rd green was prepared for "its new look" in fall 2024 and a new green was sodded with bentgrass in spring 2025, part of more than 13,000 square feet of sod laid that spring. The posts do not say whether its outline or position changed.
Sources: Lake Kezar Country Club, President's Blog November 2024 · Lake Kezar Country Club, President's Blog May 2025
Completed2024–2025
Lovell, ME
Greens
Lake Kezar Country Club staff (in-house)
The 3rd green was prepared for "its new look" in fall 2024 and a new green was sodded with bentgrass in spring 2025, part of more than 13,000 square feet of sod laid that spring. The posts do not say whether its outline or position changed.
Sources: Lake Kezar Country Club, President's Blog November 2024 · Lake Kezar Country Club, President's Blog May 2025
Completed2024–2025
Chevy Chase, MD
Greens, bunkers, fairways, trees and routing
Andrew Green
Described as a renovation by Golf Digest
Andrew Green's renovation, guided by early-1930s aerials of Alison's course, enlarged the greens, recreated Alison's bunkers, widened the playing corridors, removed selected trees and built a new par-3 15th as an homage to the lost 10th.
Sources: Derek Duncan, Golf Digest, Best Renovations of 2025 · Chevy Chase Club, Club History
Completed2025
Dartmouth, MA
Greens and bunkers
Sanford Ferris Golf Design, NMP Golf Construction (builder)
Described as a restoration by Golf Course Architecture
Sanford Ferris Golf Design's master plan, built by NMP Golf Construction in eight weeks, expanded the greens back to their original size and shape, brought back many of Willie Park Jr.'s bunkers and relocated others, added two fairway bunkers on the 5th, recontoured the 14th and renewed drainage and irrigation.
Source: Golf Course Architecture, "Sanford Ferris returns Willie Park Jr bunkers to CC New Bedford," Issue 82
Completed2024–2025
Melbourne, FL
Greens, tees and fairways
Described as a renovation by Space Coast Daily
The city overhauled the greens, pump system and irrigation, improved fairways and tees and expanded the driving range, paid for partly with American Rescue Plan Act money. No architect was named.
Source: Space Coast Daily, "Crane Creek Reserve Golf Course Set to Reopen Jan. 11 After Major Renovation"
Completed2024–2025
Skokie, IL
Greens and bunkers
Tyler Rae
Described as a restoration by Chicago District Golfer
Tyler Rae rebuilt the greens from GPS scans to recover Ross's shapes and hole locations, excavated and rebuilt the bunkers, regrassed the whole course, installed new irrigation and split the pond before the 18th green in two.
Sources: Chicago District Golfer, "Around the CDGA" · Chicago District Golfer, "Feature: Evanston GC"
Completed2024–2025
Highlands, NC
Greens, bunkers and fairways
Ron Forse
The 12th and 14th greens were rebuilt with new subgrade and drainage and sodded with Pure Distinction bentgrass. The 12th green grew by roughly 700 to 1,000 sq ft into its left approach and its front-left bunker nearly doubled; the 17th and 11th approaches were regraded.
Sources: Highlands CC Agronomy Blog, 'Golf Course Update for the Weekend and the 12th Hole' · Highlands CC Agronomy Blog, 'Tuesday' · Highlands CC Agronomy Blog, 'Monday' · Highlands CC Agronomy Blog, 'Architect Visit Thursday' · Highlands CC Agronomy Blog, 'Tuesday' · Highlands CC Agronomy Blog, 'What to Expect in Regards to #12 and #14 Greens...' · Highlands CC Agronomy Blog, 'Opening Day Expectations'
Completed2025
Hyannis Port, MA
Greens and bunkers
Ron Forse
Described as a redesign by Top100GolfCourses reviewer Andy Cocker (2025)
The 2nd green was moved back and up into the hillside on the left, benched into the slope, following Ross's 1930 drawing for the hole. The work covered roughly the last 150 yards of the hole and included new bunkering around the raised green.
Sources: The Fried Egg, Hyannisport Club course profile (Garrett Morrison) · Top100GolfCourses review by Vinny Lazzara · Top100GolfCourses review by Andy Cocker
Completed2025
Pittsford, NY
Greens, bunkers and trees
Tyler Rae
Described as a restoration by the club
A five-year restoration led by Tyler Rae, which the club described in late 2025 as recently completed. A 2026 review, by a visitor who played while the work was under way, says Rae appears to have removed the trees down the right of the 7th and added six fairway bunkers, and to have restored the 12th green to its original dimensions; the club has not published the full scope.
Sources: Monroe Golf Club, Head Golf Professional position profile (resume deadline December 31, 2025) · Tyler J. Rae, client list · Worldgolfer, Review: Monroe Golf Club · Top100GolfCourses, review by buffalogolfer
Completed
Osterville, MA
Bunkers and fairways
Gil Hanse Golf Course Design
Described as a restoration by the club and Hanse Golf Course Design
Full 18-hole restoration to Ross's original design under a Hanse master plan, with all 66 bunkers reshaped and rebuilt with Billy Bunker liners, natural collection areas enhanced and the waste area in front of the 3rd green reintroduced. The project also replaced irrigation and drainage and redesigned the practice facility; greens and green sites were kept.
Sources: Oyster Harbors Club, Assistant Superintendent position posting · Hanse Golf Course Design, Restoration Projects · Mass Golf, Massachusetts Open preview · Mass Golf, Oyster Harbors to host 2026 Massachusetts Open
Completed2025
Tyngsboro, MA
Bunkers and fairways
Nagle Design Works (Jim Nagle), MAS Golf (builder), Ron Forse
Described as a redesign by Golf Business News (headline: "bunker redesign"; body: "bunker reconstruction")
Nagle Design Works reconstructed the course's bunkers, replacing the steep grass-faced bunkers from 2009 with irregular sand lines, flashed and partly laid-back faces and bunker liners, modelled on the 2002-03 bunkers at the 1st. The project also moved a few fairways and added mounds in areas blind from the tees. In December 2025 the article said drainage, lining and edge sodding were still to finish.
Source: Golf Business News, "Nagle Design completes bunker redesign project at historic Massachusetts club"
Completed2024
Dunedin, FL
Greens, bunkers, tees, fairways and trees
Kris Spence, Stantec, TDI Golf (builder)
Described as a restoration by Golf Course Architecture
Kris Spence's restoration excavated all 18 greens to their original edges and rebuilt them, returning a moved green to its original site, renovated 81 bunkers and graded out 32 obsolete fairway bunker sites, added back tees, removed trees, regrassed the fairways and installed new irrigation. Hurricanes Helene and Milton hit during construction.
Sources: Laura Hyde, "Dunedin reopens Ross course following restoration by Kris Spence and Stantec," Golf Course Architecture · Scott Griffin, "Florida's Dunedin Golf Club completes major restoration," GCM · Josh Sens, "This Donald Ross muni just came back to life with $6 million restoration," GOLF.com
Completed2024
Winnipeg, MB
Greens, bunkers, tees, fairways and routing
Jim Urbina, Riley Johns (builder)
Described as a restoration by the club
Jim Urbina restored the Ross Nine: bunkers rebuilt in Ross's style with drainage, greens returned to original size and contours, bentgrass on greens, fairways and tees, and new irrigation. Holes 5 to 7 were rerouted to restore Ross's original layout.
Sources: St. Charles Country Club, Restoration · Golf Manitoba, St. Charles Country Club restoration nearing completion · Golf Club Atlas, St. Charles (Ross/MacKenzie)
Completed2023–2024
Edina, MN
Greens, bunkers, fairways and trees
Andrew Green
Described as a restoration by the club, CBS/WCCO and GOLF (Golf Digest calls it a restoration-renovation hybrid)
All 18 holes reworked from Ross's 1919 blueprints: every bunker rebuilt, greens pushed to the edges of their pads, fairway width restored and trees removed. New or shifted greens on the 1st, 3rd, 8th, 13th and 16th, the 10th green moved 50 yards back, and the 5th green recreated from Ross's plan.
Sources: WCCO/CBS Minnesota, "Interlachen Country Club draws on history to inspire golf course renovation" · Golf Digest Best Renovation (Derek Duncan), via Australian Golf Digest · GOLF, Top 100 newcomer spotlight · Interlachen CC, History · The Fried Egg, Interlachen profile
Completed2024
Lovell, ME
Greens
Lake Kezar Country Club staff (in-house)
The club rebuilt the 6th green on a new subbase in spring 2024; the July 2024 president's blog said it expected to open the green the following week. The posts do not say whether the green's outline or position changed.
Sources: Lake Kezar Country Club, President's Blog March 2024 · Lake Kezar Country Club, President's Blog May 2024 · Lake Kezar Country Club, President's Blog June 2024 · Lake Kezar Country Club, President's Blog July 2024
Completed2024
Lovell, ME
Greens
Lake Kezar Country Club staff (in-house)
The club rebuilt the 6th green on a new subbase in spring 2024; the July 2024 president's blog said it expected to open the green the following week. The posts do not say whether the green's outline or position changed.
Sources: Lake Kezar Country Club, President's Blog March 2024 · Lake Kezar Country Club, President's Blog May 2024 · Lake Kezar Country Club, President's Blog June 2024 · Lake Kezar Country Club, President's Blog July 2024
Completed2023–2024
Linville, NC
Greens
Andrew Green
Described as a restoration by PineStraw Magazine
First phase of Andrew Green's restoration from Ross's 1924 course plan, restoring lost features, dimensions and undulations. Seven holes were worked on during the off-season so the course stayed open in summer.
Source: PineStraw Magazine, Lee Pace, "Golftown Journal"
Completed2016–2024
Blowing Rock, NC
Greens, bunkers and trees
Kris Spence
Kris Spence's phased work began on the 10th to 13th in September 2016 (new greens, Raynor-style grass-faced bunkers, tree removal, the 12th green moved back about 30 yards and two ponds removed) and has added or improved template holes elsewhere, including a Short at the 6th rebuilt in 2023-24.
Sources: Sean Dudley, "Kris Spence to add Raynor flavour to four holes at Blowing Rock," Golf Course Architecture · Blowing Rock Country Club, "A High Country Gem. A National Treasure." (course history)
Completed2024
Newton Centre, MA
Bunkers
Eric Iverson
Described as a renovation by the USGA
The club completed an extensive renovation of its bunkers and their surrounds under the supervision of Eric Iverson. Dates uncertain: the USGA reported it complete in February 2025.
Source: USGA, "Charles River Country Club to host 2031 U.S. Senior Women's Amateur" (via New England dot Golf)
Completed2023–2024
Atlanta, GA
Greens, bunkers, tees and fairways
Andrew Green
Described as a restoration by the PGA TOUR
Andrew Green's restoration, begun the week after the 2023 TOUR Championship, rebuilt the greens and bunkers, regrassed the course and changed several holes, including a larger 2nd green, a shorter 8th and a trench bunker at the 17th.
Sources: PGA TOUR, "One of the hottest architects in golf will begin East Lake renovation the week after the TOUR Championship" · Richard Humphreys, "Renovated East Lake makes debut at Tour Championship," Golf Course Architecture
Completed2023–2024
Highlands, NC
Greens, tees and fairways
Ron Forse, Green-Tee Golf (builder)
The 2023-24 list (contractor Green-Tee Golf, started December 4, 2023): enlarge the 2nd-hole tees, re-level and regrass the 9th tee, improve forward tees on nine holes, sand-cap the 15th approach and expand the 17th green to gain a front-right hole location. The 17th green was about 1,000 sq ft larger by January 2024; in February 2024 the 5th approach was widened to match its green and the 3rd approach tied into the 4th tees.
Sources: Highlands CC Agronomy Blog, 'Monday- Start of 2023-2024 Capital Projects' · Highlands CC Agronomy Blog, '#5 Approach' · Highlands CC Agronomy Blog, '#4 Tee Re-Shaping' · Highlands CC Agronomy Blog, 'Thursday Update' · Highlands CC Agronomy Blog, 'Sod Harvesting'
Completed2024
Knoxville, TN
Bunkers
Kris Spence, Ryan Blair, Golf Course Superintendent (in-house)
Described as a renovation by the club ('a major renovation')
Rebuild of the course's bunkers for drainage and playability with new sand, guided by Ross's drawings, aerial photographs and routing maps. A few bunkers were reduced, removed (converted to grass hollows) or moved further from the tees. On the 15th the left bunker complex and mounding were reshaped, then partly reworked after member objections.
Sources: Holston Hills Country Club, Golf page · Golf Club Atlas forum, 'Holston Hills "improvements" - I'm not so sure of that' · Kris Spence Golf Design, Future, Current & Recent Projects
Completed2024
Toledo, OH
Bunkers
Andrew Green, Heritage Links Golf (builder), John Zimmers (in-house), Mike Kuhn (consultant)
Green returned to continue the master plan, with major work on irrigation and bunkers; the club says every hole was touched. A new Rain Bird irrigation system of about 2,000 heads was installed from April 2024 by Heritage Links, and the course stayed open.
Sources: Inverness Club, Andrew Green · Inverness Club, History · Rain Bird 360, 'Inverness Club'
Completed2023–2024
Plymouth, MA
Greens and bunkers
Work on the 2nd and 3rd greens and their bunkers, seen under way in October 2023 and reported complete in July 2024. The reviewer says it added challenge to the 3rd. No architect or club announcement found.
Source: Top100GolfCourses review update (Andy Cocker)
Completed2024
Nashville, TN
Greens and tees
Bruce Hepner, Tennessee Golf Foundation
Described as a restoration by Metro Nashville Parks (course page); news reports call it a renovation
New green complexes and green surrounds on all 18 holes, planted to TifEagle Bermuda in summer 2024, with some teeing areas expanded, new irrigation and clubhouse upgrades. Before the work many holes had alternate greens; the club's later card also shows the 8th as a 116-yard par 3 (a 308-yard par 4 before).
Sources: Metro Nashville Parks, Shelby Golf Course · Tennessee Golf Foundation, TGF Assists with Renovation of Two Metro Nashville Golf Courses · WSMV, Shelby Park Golf Course undergoing 1-year closure for renovations · WSMV, Nashville's oldest public golf course reopens after renovations · Golf Club Atlas, Mike Hendren (Bruce Hepner recently renovated it) · Metro Nashville Parks, Updated Shelby Golf Course scorecard
Completed2024
Orange, TX
Greens
Manager Trey Smith told KOGT in October 2024 that the club had spent a large sum upgrading the greens that year. No scope, architect or contractor was published.
Source: KOGT, Sunset Pool Covered Up
Completed2022–2023
Sarasota, FL
Greens, bunkers, tees and routing
Richard Mandell
Described as a restoration by Golf Course Architecture
Richard Mandell restored the Ross 18 as one course with all but two greens in their original places, painted the bunker lines from Ross's plan, raised the playing surfaces, built the front-nine canal Ross had sketched and removed the 1987 pond on the 18th. About 90 acres became a nature park.
Sources: Golf Course Architecture, "City of Sarasota breaks ground on Bobby Jones renovation" · Golf Course Architecture, "Sarasota's Bobby Jones club reopens after renovation" · Golf Course Architecture, "Richard Mandell to restore Ross features at Bobby Jones GC"
Completed2023
Worcester, MA
Greens, bunkers, tees, fairways and trees
Gil Hanse, Hanse Golf Design, Jim Wagner (associate), Kevin Murphy (associate), Ben Hillard (associate), MAS Golf Construction (builder), Adam Moore (in-house), Brad Klein (consultant)
Described as a restoration by the architect (Hanse Golf Design, via Golf Course Architecture) and Bradley Klein
Hanse Golf Design rebuilt all bunkers, reinstating Ross bunkers where original sand was found, expanded greens to their original footprints (average 6,880 to 7,780 sq ft), widened and connected fairways (28 to 32 acres), cleared trees and added tees. The 11th green was lowered by about eight feet to original grade and rebuilt with a restored cross bunker in its approach. Forward tees (2022) and tree work in prior years preceded the main construction.
Sources: Bradley S. Klein, The First Call · Golf Course Architecture
Completed2023
Erie, PA
Greens and bunkers
Kris Spence
Described as a restoration by the architect (plan titled "Ross Bunker Restoration Plan")
All bunkers on the course were redone to a plan drawn over Ross's original drawing of the course, and the 17th and 18th greens were redone. The club engaged Spence in 2022 and reports completion in September 2023.
Sources: The Kahkwa Club, History · Spence Golf Inc., Ross Bunker Restoration Plan for The Kahkwa Club
Completed2022–2023
Winnipeg, MB
Greens, bunkers, tees, fairways and routing
Jim Urbina, Riley Johns (builder)
Described as a restoration by the club
Jim Urbina restored the MacKenzie Nine: bunkers rebuilt in MacKenzie's style with drainage, greens returned to original size keeping the 1928 contours, and greens, fairways and tees seeded to bentgrass with new irrigation. MacKenzie's 3rd (today's 12th) was recreated in its original position.
Sources: St. Charles Country Club, Restoration · Golf Manitoba, St. Charles Country Club restoration nearing completion · Golf Club Atlas, St. Charles (Ross/MacKenzie)
Completed2021–2023
Waynesville, NC
Greens, bunkers, tees, fairways and routing
Bobby Weed Golf Design, Joey Graziani (associate), MacCurrach Golf Construction (builder)
Described as a restoration by Golf Course Architecture and Bobby Weed Golf Design (for the Ross Nine); the club's owner called the overall project a renovation
Bobby Weed Golf Design reduced the 27-hole facility to 18. Ross's Carolina nine was kept as the front nine with its small greens, short-cut surrounds and bunkers restored and length added; a new back nine was assembled from holes of the Dogwood and Blue Ridge nines, and the unused holes became practice areas, a short course and development land.
Sources: Bobby Weed Golf Design, Waynesville Inn & Golf Club Shines After Weed's Transformation · Bobby Weed Golf Design, Waynesville Inn and Golf Club project page · Golf Course Architecture, Waynesville in North Carolina reopens following transformation · The Smoky Mountain News, The rebirth of mountain chic
Completed2023
Cincinnati, OH
Greens, bunkers, tees and fairways
Brian Silva
Described as a restoration by Golf Course Architecture
Second and third phases of the Silva master plan: bunkers and greens restored, 25 new fairway bunkers, all bunkers rebuilt with the Better Billy Bunker method, fairways shifted and widened by two acres, the 6th green rebuilt and moved right, new cross bunkers on the 11th, tees and fairways regrassed to T1/Alpha bentgrass, new back tees adding 300 yards and Toro Lynx irrigation. The third phase ran from September 2022 to May 2023; the second phase's dates were not found.
Sources: Golf Course Architecture, Brian Silva completes Ross restoration at Maketewah · WKRC Local 12 / Cincinnati Business Courier, Greater Cincinnati golf course re-opening after $6.5M restoration
Completed2022–2023
Asheville, NC
Greens, bunkers and trees
Kris Spence (consultant)
Described as a restoration by the course (press release)
A $3.5 million project centred on stormwater, irrigation and infrastructure, with Kris Spence preparing a master plan. Ten bunkers were restored, trees cleared and a new green and bunkers built on the 16th; mounding and broomsedge were added on the 1st and 6th.
Source: The First Call, "Asheville Municipal Golf Course, a Donald Ross Design, getting major overhaul" (course release)
Completed2022–2023
Belmont, MA
Greens, bunkers and trees
Brian Silva
Described as a restoration by the club
Brian Silva replaced the green surfaces (Greenwich Velvet to 007 creeping bentgrass) and the bunkering during a six-month closure, aiming at the style of the Ross era, and has since advised on tree removal that opened views across the 6th to 9th.
Sources: Belmont Country Club, About Us: The History of Belmont Country Club · Mass Golf, 2024 U.S. Mid-Amateur Qualifying - Belmont Country Club
Completed2020–2023
Cedar Rapids, IA
Greens, bunkers, tees and fairways
Ron Prichard
After the August 2020 derecho felled about 700 mature trees, Prichard rebuilt and enlarged almost every bunker, widened fairways again, redesigned the 5th green and 6th tees, restored the 18th green to its 1920 size, rebuilt the 9th's punchbowl and added a second green on the 16th (late 2022 to early 2023).
Sources: Adam Lawrence, "Cedar Rapids: Blown away," Golf Course Architecture · Matt Rouches and Will Knights, "Cedar Rapids Country Club," The Fried Egg
Completed2023
Glens Falls, NY
Greens, bunkers, tees and fairways
Ian Andrew Golf Design, Turco Golf (builder), Noah Tubbs, CGCS (in-house)
Described as a renovation by Turco Golf (builder), project post
The 1st tee was moved back, described by the builder as a return to Ross's original location; the 5th fairway was expanded; a new tee was built on the 10th; the 12th green's feeder slope was rebuilt; and the 16th received green and fairway renovation, new bunkers and irrigation.
Source: Turco Golf, Glens Falls Country Club project post
Completed2022–2023
Highlands, NC
Bunkers and tees
Ron Forse, Green-Tee Golf (builder)
The club's list for winter 2022-23 (contractor Green-Tee Golf) was to reshape and rebuild the remaining master-plan bunkers on the 1st, 2nd, 3rd, 4th, 6th and 9th, build a new Ross tee in front of the back tee on the 13th and extend the 16th tee about 10 yards forward, alongside front-nine irrigation. The 6th's bunkers were being shaped in February 2023, and the 13th and 16th tees were finished by March 2023; completion of the other bunkers is not stated in the posts read.
Sources: Highlands CC Agronomy Blog, 'Irrigation, Capital Projects and 7-Day Forecast' · Highlands CC Agronomy Blog, '#6 Bunkers' · Highlands CC Agronomy Blog, 'Project Updates'
Completed2023
Kenosha, WI
Bunkers
Drew Rogers, Hollembeak Construction (builder)
Described as a renovation by Golf Course Architecture
Bunkers were renovated closer to their original Ross design, with a few shifted so they bear on today's distances.
Sources: Golf Course Architecture, "Rogers recovers Donald Ross's work as Kenosha renovation enters tenth year" · J. Drew Rogers, Kenosha Country Club project page (bunker renovation scheduled for fall 2023)
Completed2023
Sarasota, FL
Tees and fairways
Fairways, tees and approach areas were regrassed with Bimini bermudagrass sprigs in summer 2023.
Sources: Sara Bay Country Club, Course Restoration and Master Plan · Sara Bay CC release, Restoration of historic Donald Ross course continues as part of master plan
Completed2022–2023
West Hartford, CT
Greens, bunkers, tees, fairways and trees
Tyler Rae, Kyle Franz, Bradley Klein (consultant), MAS Golf Course Construction (builder), Golf Preservations Inc.
Described as a restoration by the architects' master plan and Golf Course Architecture
Restoration of the 1924 Ross course from Ross's field drawings and early aerials. Fairways widened from about 30 to 38 acres and bunker area doubled to about 140,000 sq ft, much of it cross bunkers; three greens (4, 5, 14) rebuilt as push-ups and lost perimeters recaptured on more than half the holes; new back, intermediate and forward tees; tree removal.
Sources: Golf Course Architecture, Ross restoration begins at Wampanoag · Franz, Rae and Klein, Golf Course Restoration Narrative (in West Hartford IWWA file 1182) · CSGA, 124th Connecticut Amateur Heads to Wampanoag Country Club (restoration completed in 2023) · Wampanoag Country Club, Golf page
Completed2022–2023
Dearborn Heights, MI
Greens, bunkers, tees and fairways
Revive Golf Management (in-house)
Described as a renovation by Club + Resort Business and the club's home page ('Reopens Following Renovation Work'); the club history calls the start 'restoration efforts'
After the course sat unmaintained through 2022, the crew sodded the greens with 007XL bentgrass, cut down and reseeded fairways and tees, recut bunkers and refilled them with sand, and added drainage on nearly every hole, with pump-station upgrades and raised river banks. New cart paths were finished in June 2023.
Sources: Warren Valley Golf Course, History · Club + Resort Business, A 'Once-in-a-Lifetime Opportunity' at Warren Valley GC · David Theoret, GolfGuide.com, Warren Valley Golf Course - Resurrecting a Donald Ross Classic
Completed2022
Belleair, FL
Greens, bunkers, fairways, trees and routing
Fry/Straka, Clarke Construction (builder)
Described as a restoration by Golf Course Architecture
Fry/Straka undid sixty years of changes: more than a thousand trees and two ponds removed, every green rebuilt to Ross's 1924 contours (some lowered by as much as twenty feet), fairways widened and the course regrassed. A new par-3 7th was built on a promontory leased from the town. Fry/Straka calls it a hybrid of restoration and renovation.
Sources: Golf Course Architecture, "Fry/Straka restores Ross design on Belleair's West course" · Adam Lawrence, "Belleair: Seaside special," Golf Course Architecture · Belleair Country Club, About Us
Completed2022
Jacksonville, FL
Greens, bunkers, tees and fairways
Bruce Hepner
Described as a renovation by PGA TOUR
A master-plan project rebuilt all 18 greens, regrassed the fairways and tees, added bunkers, expanded native planting and installed new irrigation and drainage. The 11th green became a brand-new complex and the 18th gained bunkers for tee shots and a greenside bunker set closer to the green.
Sources: PGA TOUR, Power Rankings: Constellation Furyk & Friends · Golfdom, Alan Brown shares how he handled a hurricane a week before hosting a pro tournament
CompletedFrom 2022
Greensboro, NC
Tees and routing
Keith Foster, Medalist Golf (builder)
After the clubhouse and pool expansion took part of the practice ground, the practice area and first tee were rebuilt to Keith Foster's design by Medalist Golf. The holes were resequenced (new 2-4 = old 18, 16, 17; new 5-18 = old 2-15), reversing the nines' pars to 34-37, with new cart paths.
Sources: Douglas Lowe, 'Irving Park Range Restoration Finally Underway' · Douglas Lowe, 'Spring Officially Arrives...' (IP clubhouse, pool and fitness renovation)
Completed2021–2022
Kennett Square, PA
Greens, bunkers, tees and fairways
Kennett Square G&CC grounds staff (in-house)
Bunkers rebuilt across the course with Better Billy Bunker liners, new drainage, regraded contours and tie-ins; some bunkers removed, merged or added. The 11th green was expanded at the back and its edges lowered, the 5th approach shrunk, and the 9th back tee extended.
Sources: KSGCC grounds blog, "Bunker Project Begins" · KSGCC grounds blog, "Holes 4-7" · KSGCC grounds blog, "Work on #16" · KSGCC grounds blog, "The Closing Stretch"
Completed2017–2022
Rye, NY
Greens, bunkers and fairways
Keith Foster
Keith Foster expanded the greens, widened the fairways and renovated the bunkers, restoring width but not the 1920s pot-bunker sets.
Sources: The Apawamis Club, Golf Course · M. James Ward, "Grade A Architecture: The Apawamis Club, New York," Golf Today
Completed2020–2022
Indianapolis, IN
Greens, bunkers, tees, fairways and trees
Bruce Hepner
Bruce Hepner returned to finish Renaissance's 1999 master plan: he rebuilt and repositioned all 135 bunkers from old aerial photographs, improved their drainage, adjusted fairway and green edges, added short grass and teeing ground and thinned almost 300 trees.
Sources: Broadmoor Country Club, Our Course History · Emily Reuben and Jyoti A. Verderame, "Broadmoor Country Club," Encyclopedia of Indianapolis
Completed2019–2022
Buck Hill Falls, PA
Course work
Rees Jones, Bryce Swanson (associate), Andrew Mutch, NMP Golf Construction (builder)
Described as a restoration by the club
For the 2022 centennial the club says the 18 holes were fully restored over several years with Rees Jones, golf historian Andrew Mutch and NMP Golf Construction. Neither the club nor the firm has published what the work changed hole by hole; Rees Jones, Inc. says it is preparing master plans for all three nines.
Sources: Buck Hill Falls, Golf · Rees Jones, Inc., Buck Hill Falls
Completed2019–2022
Burlington, VT
Bunkers and tees
Robert McNeil, Northeast Golf Company
Robert McNeil of the Northeast Golf Company rebuilt every bunker in a Ross style, added subsurface drainage on the wet 7th, 8th, 9th and 18th and expanded the forward tees. Dates uncertain: a January 2023 post calls the work recently completed.
Sources: Golf Course Architecture, "McNeil plans to recapture Ross bunker style at Burlington CC" · Ken Merritt and replies, "Waubanakee Golf Club," Golf Club Atlas
Completed2022
Highlands, NC
Bunkers and tees
Ron Forse
First winter of Ron Forse's master plan. A fairway bunker on the right of the 5th that had been removed was rebuilt, the bunker on the 14th reworked, forward tees set into the fairways of the 7th and 8th, and the 18th green surrounds regraded with a swale and a wider approach.
Sources: Highlands CC Agronomy Blog, 'Ron Forse Visit' · Highlands CC Agronomy Blog, '#18 Green Complex' · Highlands CC Agronomy Blog, '#18 Green Surrounds' · Highlands CC Agronomy Blog, 'Would Donald Ross Recognize Highlands CC?'
Completed2020–2022
Toronto, ON
Bunkers, tees and fairways
Rees Jones team, Bryce Swanson, Rees Jones Inc. design associate (associate)
Described as a renovation by the club ("bunker renovation project")
Several tee decks were enlarged and some fairway grass lines changed from the fall of 2020. A bunker renovation from the fall of 2021 into 2022 added new fairway and greenside bunkers, split a couple in two and reshaped many others with Billy Bunker liners.
Sources: Lambton G&CC, History Timeline 1902-2022 · I LAMBTON Issue 3, Brent Long, "Rees Jones Leaves His Mark"
Completed2022
Bedford, NH
Course work
Described as a renovation by the club
The club renovated its signature par-3 13th in 2022 in preparation for the centennial year. No architect is named.
Sources: Manchester Country Club, Centennial history timeline (Hole 13 Renovation, 2022) · New England dot Golf, "Manchester Country Club Celebrating 100 Years"
Completed
West Orange, NJ
Greens, bunkers, tees and fairways
Brian Schneider of Renaissance Golf Design
Described as a restoration by the club
The final phase was to restore Banks's Fourth Nine (large elevated greens, flat-bottomed bunkers) with the same work scheme. The club's history page now includes the Fourth Nine in Schneider's restoration, without dates.
Sources: Club release via First Call Golf (scheduled 2022) · Montclair Golf Club, Club History
Completed2022
Highland Park, IL
Greens, fairways and routing
Tyler Rae Golf Design, Duininck Golf (builder)
Described as a renovation by the club
The White nine was rebuilt to fix drainage and raise flood-prone ground. Several playing corridors were realigned into a revamped routing, Tyler Rae shaped the greens himself, and water features were added. Duininck Golf was the builder.
Sources: The Golf Wire, Northmoor Country Club's White Course receiving substantial upgrades · Northmoor Country Club, Head Golf Professional search page ('completely renovated by Tyler Rae in 2022') · Golf Course Industry, Duininck release (would not open) · Tyler J. Rae, Current Projects
Completed2021–2022
Cinnaminson, NJ
Bunkers
Tyler Rae, Riverton Agronomy team (in-house)
Described as a restoration by the club
Final phase of the club's Donald Ross restoration on the last seven holes, begun in October 2021 by the club's agronomy team. Tyler Rae designed each hole and shaped on the ground. The club says it works from historic course photographs, Ross's sketches and field notes.
Sources: Riverton Country Club, Donald Ross Restoration · Riverton Country Club, Golf
Completed2021–2022
Peabody, MA
Trees
Mayer Tree Service
Described as a renovation by GolfPass
683 trees were cut down across the course in two weeks. 233 of them were in areas under the Peabody Conservation Commission, which issued an enforcement order and required restoration planting. GolfPass describes the removal as renovation work.
Sources: Club + Resort Business, Club threatened with loss of tax abatement over tree removals · Peabody Conservation Commission minutes, 9 Nov 2022 · GolfPass, April 2022 golf course news notes · Peabody Conservation Commission special hearing minutes, 12 Jul 2023
Completed2022
Sarasota, FL
Bunkers
Kris Spence
Described as a renovation by Golf Course Architecture
Spence rebuilt bunkers with the Capillary Bunkers liner. Golf Course Architecture describes the work as a rebuild of the greenside bunkers; Golf Business News, from the same interviews, says the greenside bunkers were rebuilt in 2018 and describes a second phase rebuilding fairway bunkers and adding surface contour, with construction finished in early July.
Sources: Golf Course Architecture, Kris Spence rebuilds greenside bunkers at Sara Bay · Golf Business News, Capillary Bunkers aids restoration at Sarabay
Completed2021–2022
Columbus, OH
Greens, bunkers, tees, fairways and trees
Andrew Green, McDonald & Sons (builder), Bob Becker and staff (course superintendent) (in-house), Bradley Klein (consultant)
Described as a restoration by GOLF, The Fried Egg and CityScene (Golf Course Architecture's headline calls it a renovation)
Andrew Green lowered every green toward its original grade, rebuilt all bunkers with liners, levelled or rebuilt all tees, widened fairways and capped approaches with greens mix, working from a 1926 aerial cartoon and old photographs. The 8th and 17th greens were returned to their original locations and trees were removed. A new irrigation system was installed at the same time.
Sources: Golf Course Architecture, Ground game comes to the fore at Scioto Country Club · GOLF, Scioto (Top 100 Courses in the U.S. 2024-25) · Hurdzan Golf, Scioto CC · The Fried Egg, Scioto Country Club profile · Golfdom, "Scioto Country Club membership approves master plan and restoration" · Bradley Klein, Design (current and previous projects)
Completed2021–2022
Absecon, NJ
Bunkers
Turco Golf (builder)
All greenside bunkers were modified and rebuilt with a Capillary Concrete drainage and liner system, and about 15,000 square feet of cart paths were replaced.
Source: Seaview Hotel & Golf Club / Troon press release
Completed2022
Glencoe, IL
Greens and bunkers
Brian Schneider of Renaissance Golf Design, Don Cross (in-house)
Described as a restoration by the club
Brian Schneider of Renaissance Golf Design restored the course's bunkering and green complexes. The Ross Society says he and superintendent Don Cross worked from newly found photographs and drawings showing the course as Bendelow, Ross, and Langford and Moreau left it.
Sources: Skokie Country Club, home page (Our Story) · Donald Ross Society, Skokie Country Club in IL · Western Golf Association, Golf's rising stars set to take on Skokie Country Club
Completed2021–2022
Rumford, RI
Greens, bunkers and tees
Andrew Green
Described as a renovation by GolfNewsRI ("massive golf course renovation"); GolfPass calls it a restoration
Andrew Green returned the greens to Ross's original shapes, using surviving original green pads, and expanded nearly every green. Every bunker was renovated and some were moved, and new tees were added, more forward than back, including a back tee at the 12th beyond a cart path near the 18th fairway.
Sources: GolfNewsRI, "EXCLUSIVE: Inside the Massive Wannamoisett Renovation" · GolfNewsRI, "Revamped Wannamoisett Scheduled to Open Mid-May" · GolfNewsRI, "Course Review: Wannamoisett - June 7, 2022" · GolfNewsRI, "Renovation of Wannamoisett Ranked Best in U.S." · GolfPass, "22 notable golf course renovations to be unveiled in 2022"
Completed2021–2022
White Plains, NY
Greens, bunkers, tees and fairways
Rees Jones, Bryce Swanson (associate)
Described as a renovation by the club and Troon ('redesign and renovation'; the club timeline says 'renovation & re-design')
Rees Jones expanded greens by about 20,000 sq ft, fairways by 30,000 sq ft and chipping areas by 50,000 sq ft, renovated every bunker with new sand and capillary-concrete drainage, and added new tees. XGD drainage went into all greens and a new irrigation system was installed. The 2021 announcement called for 14 greens to be expanded.
Sources: First Call Golf (Troon release), Westchester Hills to begin major Rees Jones-led redesign and renovation · Troon, Westchester Hills Golf Club Unveils New Rees Jones Redesign · Rees Jones, Inc., Westchester Hills Golf Club · Westchester Hills Golf Club timeline
Completed2019–2021
Bloomfield Hills, MI
Greens, bunkers, tees, fairways and trees
Gil Hanse, Jim Wagner, Kye Goalby (associate), Caveman Construction (builder), LaBar Golf Renovations (builder), Phil Cuffare, director of agronomy (in-house)
Described as a restoration by the club and the architect (Hanse Golf Course Design); Golf Course Architecture notes Hanse sometimes calls it historic renovation
All 18 greens cored to the original subgrade and rebuilt to USGA specification, average size enlarged from 5,889 to about 8,000 sq ft; the 3rd green was moved and the 7th green rebuilt on its original site. Bunkers reduced from 125 to 103 while sand area grew from 125,000 to 200,000 sq ft, front bunkers removed on about a dozen holes, fairways widened with major tree removal, new tees including a 592-yard back tee on the 2nd, and new irrigation and drainage.
Sources: Oakland Hills Country Club, Timeline · Bradley Klein, Oakland Hills: South roars back, Golf Course Architecture · Golf Course Architecture, Oakland Hills set to reopen South course (Hanse Golf Course Design repost) · Brandon Tucker, What lies under the Monster, GolfPass · Golfdom, "Oakland Hills CC South Course reopens following restoration"
Completed2020–2021
Richmond, VA
Greens, bunkers, trees and routing
Love Golf Design, Scot Sherman
Described as a renovation by Henrico County
Love Golf Design, with Scot Sherman as lead architect, turned the 18 into a 12-hole course on the old 7th to 18th, renumbered, restoring greens and bunkers to Golden Age contours and clearing trees. The rest became a range, short-game area, the six-hole Little Bell course and a putting course.
Sources: First Tee - Greater Richmond, Henrico County and Love Golf Design, "Belmont Celebrates Grand Re-Opening" (via The First Call) · Henrico County, "Henrico to lease Belmont Golf Course to The First Tee of Greater Richmond" · Scott Michaux, "American golf history meets its future at Belmont," Global Golf Post
Completed2021
Melvin Village, NH
Greens, bunkers, tees and fairways
Forse Golf Design, Jim Nagle (associate), MAS Golf (builder)
Described as a restoration by The Golf News Net
Forse Design's second stage, complete by the 2021 centennial, added bunkers on the 3rd fairway and five on the 18th, widened fairways, expanded nearly every green to its full pad, added contour on two or three greens and built shorter tees.
Sources: Jay Flemma, "Forse Design restores Donald Ross at New Hampshire's Bald Peak Colony Club," The Golf News Net · Jay Flemma, "Forse of Nature: Ron Forse, Jim Nagle Restore Donald Ross at New Hampshire's Bald Peak Colony Club," Golf Course Trades
Completed2021
Rocky Mount, NC
Bunkers
Kris Spence (consultant), Land Innovations (builder)
Ahead of the centennial the club rebuilt 42 greenside bunkers in accordance with Ross's drawings, with Kris Spence consulting and Land Innovations building.
Source: Ken Klavon, "Centennial Celebrations Paying Tribute to Donald Ross' Brilliance," Sports Illustrated
Completed2019–2021
Bethesda, MD
Greens, bunkers, tees and fairways
Andrew Green
Described as a renovation by the KPMG Women's PGA Championship course guide
Andrew Green rebuilt and enlarged the greens, widened the fairways from about 25 to 46 acres and increased the bunkers from 98 to 138, with hole changes at the 2nd, 7th, 10th, 11th and 15th. Klein wrote that it was not a restoration.
Sources: Bradley Klein, "Congressional change," Golf Course Architecture · Kent Paisley, "The Course Director's Guide to the Renovated Congressional Blue Course," KPMG Women's PGA Championship
CompletedFrom 2021
Verona, PA
Greens, tees, fairways and trees
Described as a restoration by the club ("a multi-year restoration of the golf course")
New full-coverage irrigation, drainage beneath every green, new senior tees and championship tees that lengthened the course, and fairways expanded to what the club calls their original design. Bobby Jones Links reported in 2024 that trees were also removed to open up the course.
Sources: Green Oaks Country Club, Golf page (History of Green Oaks) · Bobby Jones Links release via The First Call
Completed2021
Minneapolis, MN
Course work
Kyle Franz, Jeff Johnson, superintendent (in-house)
Master plan commissioned in 2018 to bring back Ross features of the 1927 U.S. Amateur era, with the work recorded as completed in fall 2021. The course was also regrassed in the same period (a 2018 Golf Club Atlas post said the plan was all bentgrass); no source publishes which holes or features changed.
Sources: Wikipedia, The Minikahda Club · GolfPass, Kyle Franz architect profile · Golfdom, Tips to regrassing success from Jeff Johnson, superintendent, The Minikahda Club · Golf Club Atlas, Top 30 Courses in Minnesota thread
Completed2020–2021
West Orange, NJ
Greens, bunkers, tees and fairways
Brian Schneider, Renaissance Golf Design, Michael Campbell (in-house)
Described as a restoration by the club
Phase II on the Third Nine rebuilt the greens of its 3rd, 5th, 6th and 9th and recontoured the other green perimeters to regain hole locations. Bunkers were rebuilt with Better Billy Bunker linings, some removed and others added, short grass was taken back to the sand lines and tees were rebuilt, using 1930 aerials. On the 2nd, Schneider's plan reintroduced lost mounds, a right greenside bunker was removed and the green was enlarged from 4,200 to 4,800 sq ft. Reopening was expected for Memorial Day weekend 2021; the club had unveiled the nine by 7 July 2021.
Sources: Hunter PR release via The Golf Wire · Golf Course Architecture · Club release via First Call Golf · Golf Today, Ward, 3rd Nine
CompletedFrom 2021
Oconomowoc, WI
Bunkers
Ross Golf Design (builder)
Described as a restoration by the architect (Ross Golf Design)
Ross Golf Design provided shaping and construction administration for what it calls a multi-phase restoration, beginning in fall 2021. Its work removed unoriginal bunkers on the 5th and 11th and restored the greenside bunker on the 17th.
Source: Ross Golf Design, Oconomowoc Golf Club project page
Completed2020–2021
Southern Pines, NC
Greens, bunkers, tees, fairways and trees
Kyle Franz
Described as a restoration by the club
Kyle Franz removed more than 700 trees, widened every fairway, replaced rough around the greens with short grass, rebuilt the bunkers with Sandhills sandscapes and rebuilt every green, along with new irrigation around the greens. He added cross hazards and new back tees on the 2nd and 10th, moved the 11th green lower and closer to the lake, and built the Lost Hole, a bonus par 3 between the 4th green and 15th tee.
Sources: Ross Resorts, Southern Pines Golf Club Restoration · Golf Course Architecture, Restored Southern Pines on track for autumn opening · Golf Club Atlas, Southern Pines course profile (Ran Morrissett)
Completed2020
Auburndale, MA
Greens, bunkers, fairways, trees and routing
Tyler Rae, MAS Golf Construction (builder)
Described as a renovation by Golf Course Architecture and the architect
Tyler Rae built 67 new bunkers in a grass-faced, early Ross-period style, created a new 3rd hole and expanded the other 17 greens. New approach and fairway grassing lines were introduced and a significant number of trees removed. The course stayed open during construction.
Sources: Golf Course Architecture, Tyler Rae completes renovation work at Woodland GC · Golf Course Architecture, Tyler Rae to begin bunker renovation at Woodland this spring · Woodland Golf Club, Our History
Completed2020
Hartville, OH
Greens, bunkers and fairways
Jim Nagle, Forse Golf Design, Forefront Construction (builder), Bob Gecik (in-house)
Described as a restoration by Golf Course Architecture
From Jim Nagle's 2016 master plan, Forefront Construction rebuilt the bunkers with liners, working from Ross's tracings and old aerials: small groups were merged into single large bunkers, bunkers not on the tracings were filled and run-offs re-established. The staff had already enlarged the greens and restored fairway margins in-house. Club historian Hackett says the bunkers were redesigned rather than restored.
Source: Richard Humphreys, "Forse Design completes bunker restoration at Congress Lake," Golf Course Architecture
Completed2019–2020
Evergreen Park, IL
Greens, bunkers and fairways
Ron Prichard, Tyler Rae
Described as a restoration by Golf Club Atlas (Andrew Lewis)
The third phase, guided by photographs and aerials from about 1931, widened fairways by 15 paces or more, rescaled bunkers, restored a lost forebunker on the 1st, rebuilt the 7th green to Ross's height and the 12th to its 1931 footprint, and regrassed all greens with bentgrass.
Sources: Andrew Lewis, "Beverly CC Restoration -- 2019/2020 Edition," Golf Club Atlas · Matt Harness, "Back to the Bev," Chicago District Golfer
Completed2019–2020
Rochester, NY
Greens, bunkers, tees, trees and routing
Andrew Green, A. H. Green Design
Described as a restoration by the club ('East Course Restoration Project'); Golf Course Architecture
Every green rebuilt to USGA specification with recovered shapes and corners, every bunker rebuilt, tees extended and forward tees added, and many trees removed. A new par-3 5th was built, the old 5th was extended into a par-4 6th of over 500 yards replacing the Fazio par-3 6th, and the pond and rock wall at the 15th were replaced by a swale.
Sources: Oak Hill CC, East Course (East Course Restoration Project) · Golf Course Architecture, 'Oak Hill reopens East course following restoration by Andrew Green' · PGA Championship, 'Green's Oak Hill Restoration Ready to Test the Best' · LINKS Magazine, 'The Greening of Oak Hill' (Joe Passov)
Completed2020
Burlington, NC
Greens, bunkers and tees
Described as a restoration by the club
The greens and bunkers were restored to the 1946 plans and several new tees added. The greens were regrassed with Pure Eclipse bentgrass. No source names an architect.
Sources: Alamance Country Club, Golf · David Droschak, "Raleigh Country Club re-opens with expansive views," Triangle Golf
Completed2020
Franklin, MI
Greens
Andrew Green
Andrew Green toned down the slope of the 2nd green to provide more hole locations.
Source: Golf Association of Michigan preview of the 100th GAM Championship (republished by GolfBlogger)
Completed
Greensboro, NC
Trees
Keith Foster (consultant), Greensboro Country Club golf course management team (in-house)
Tree removal under Keith Foster's 2015 master plan for the Irving Park course: thinning of crowded pines and hardwoods, removal of trees that shaded tees (large oaks at today's 1st and 3rd) and of unsafe leaning Virginia pines. Trees tied to possible routing changes were left in place.
Source: Douglas Lowe, 'Recent Tree Removals at Greensboro Country Club'
Completed2020
Salem, MA
Bunkers
Robert McNeil, Northeast Golf Company, Country Golf, led by Jerry and Jim Demers (builder), John Eggleston, golf course superintendent (in-house)
Described as a restoration by Golf Course Architecture and the architect
Construction of 44 new bunkers in the Ross style, located from original Ross drawings for 11 holes and old aerial photographs. A few bunkers were removed and several reshaped into grassy catchment and pitch areas.
Sources: Golf Course Architecture, Richard Humphreys, "Robert McNeil nears completion of bunker restoration at Kernwood CC", 2020-11-23 · The Northeast Golf Company, "Kernwood CC" project page · Top100GolfCourses, Kernwood profile
CompletedFrom 2020
West Orange, NJ
Fairways and trees
Brian Schneider, Michael Campbell (in-house)
As part of the restoration led by Schneider from 2020, hundreds of trees were cut down to help the turf, and Schneider and Campbell widened the playing corridors.
Sources: Sports Illustrated, Giuffra · Golf Today, Ward, 3rd Nine
Completed2020
West Orange, NJ
Routing
Brian Schneider of Renaissance Golf Design
Described as a renovation by Golf Course Architecture
Phase I created an entirely new par-3 5th on the First Nine to improve the overall design and free ground for a new short-game area.
Sources: Golf Course Architecture, Phase II article · Hunter PR release via The Golf Wire
Completed2020
Raleigh, NC
Greens, bunkers, tees, fairways and trees
Kyle Franz
Described as a renovation by the club and Golf Course Architecture (the club also calls it "a thoughtful restoration")
Kyle Franz rebuilt the course in a seven-month project: greens enlarged and regrassed with Pure Eclipse bentgrass, bunkers rebuilt and increased (planned 56 to 78), creek and barranca features restored, about 500 trees removed and new back and forward tees built. A new irrigation system was installed and some cart paths were rerouted or removed.
Sources: Raleigh Country Club, Golf page · Golf Course Architecture, Construction under way on Kyle Franz renovation of Raleigh CC · Golf Course Architecture, Raleigh CC ready to reopen following Kyle Franz renovation
Completed2020
Jacksonville, FL
Bunkers and tees
Dan Schlegel, MacCurrach Golf Construction (builder)
Described as a restoration by the club
Dan Schlegel returned to restore key elements of the course toward the 1925 Ross design. The club's hole notes describe the 5th renovated to Ross's intended length, new near-centre-line bunkers on the 6th and new tee work on the 13th, without dating each; GolfPass ties the present 7,043-yard length to this phase.
Sources: San Jose Country Club, Golf · MacCurrach Golf Construction, Completed Work · GolfPass, San Jose Country Club
CompletedFrom 2019
Ionia, MI
Routing
Shadow Ridge bought the neighbouring Rolling Hills nine across Kelsey Highway in May 2019 and built a tunnel under the road so the two nines play as one 18-hole course. The Rolling Hills holes became the front nine and the 1916 Ross nine became holes 10-18.
Sources: Shadow Ridge Golf Course, home page · GolfBlogger, Shadow Ridge Golf Course Review
Completed2018–2019
Highland Park, IL
Bunkers
Michael Hurdzan
Described as a renovation by the club (superintendent's blog)
All 32 bunkers on the Red nine and 39 on the Blue were rebuilt with new edges, gravel-and-polymer liners (Better Billy Bunker, per Top100GolfCourses) and new sand, and their faces were turfed with Black Beauty fescue. The Red nine was done first, in autumn 2018; the Blue was finished in spring 2019.
Sources: Northmoor CC operations blog, Bunker Renovation Update · Northmoor CC operations blog, bunker renovation posts · Northmoor CC operations blog, New Bunkers · Top100GolfCourses, Northmoor (Blue & White): Hurdzan renovated the bunkers with Better Billy Bunker liner and Black Beauty fescue
Completed2018–2019
Wilmington, NC
Greens, bunkers and fairways
Andrew Green, McDonald & Sons (builder)
Described as a restoration by Golf Course Architecture
Andrew Green rebuilt and lowered every green, converting them to ultradwarf bermuda, rebuilt the bunkers in a Ross-inspired style, widened playing corridors and built a nine-hole par-3 course on abandoned 1980s holes.
Source: Golf Course Architecture, "Andrew Green restores Donald Ross features at Cape Fear"
Completed2018–2019
Birmingham, AL
Bunkers and tees
John LaFoy
Described as a renovation by Golf Course Architecture
John LaFoy rebuilt every bunker to Better Billy Bunker specifications with little change to their shapes, added 28 tees in a six-tee system, installed new irrigation and a lake off the 11th tee, and reworked the shared practice facilities. The greens were left almost untouched.
Source: Richard Humphreys, "LaFoy completes renovation of East course at CC Birmingham," Golf Course Architecture
Completed2018–2019
Greenwich, CT
Greens, bunkers, tees and trees
Beau Welling
Described as a renovation by the club (Platinum Clubs presentation)
All 18 greens were rebuilt to USGA specification and converted from poa annua to bentgrass, with varied sizes, shapes and internal contours; some greens were expanded, and areas around many greens were mown short. Bunker shapes and positions were changed (four fewer overall), tees were added, and trees were removed for air circulation and turf health.
Sources: Global Golf Post, 'Greenwich Redesign: Perfect Touch To A Classic' (John Steinbreder) · Greenwich Country Club, Platinum Clubs Presentation 2023-2024
Completed2019
St. Louis Park, MN
Greens, bunkers, fairways and trees
Jeff Mingay, Duininck Golf (builder), Jared Keller (in-house)
Described as a renovation by the club
Poa annua was stripped from all tees, fairways and greens and replaced with bentgrass after the winter of 2018-19. Green surfaces were taken back out to their original Park/Ross perimeters and all greens regraded, with slopes reduced on the 1st and 13th; fairway patterns were revised with tree removal and bunker changes at the 4th, 8th, 15th and 17th. XGD drainage went into all greens and irrigation was replaced.
Sources: Jeff Mingay Golf Course Architect, Minneapolis Golf Club project page · Golf Course Architecture, Minneapolis Golf Club begins re-grassing project · Minneapolis Golf Club, About Us · Minneapolis Golf Club, Golf
Completed2019
West Caldwell, NJ
Greens, bunkers and trees
Ron Prichard
Described as a restoration by GOLF.com
GOLF.com reports Prichard completed a full-scale restoration in spring 2019, restoring many greens and bunkers from Ross's sketches. Northeast Golf (2021) credits him with a new 17th green and a recontoured 18th green; the 18th-corner oak was removed in 2019 and fescue mounds and bunkers added on the right.
Sources: GOLF.com, Where I played: Mountain Ridge Country Club · Northeast Golf, Mountain Ridge moving up as LPGA visits · Mountain Ridge Country Club, Course Tour hole 18
Completed2019
Bloomfield Hills, MI
Routing
Holes 14 and 16 swapped positions in the playing sequence. No source describes construction or a change to either hole's line.
Source: Oakland Hills CC, Timeline (2019 entry)
Completed2019
Lynn Haven, FL
Greens, tees and trees
Described as a renovation by the club president (WJHG)
After Hurricane Michael (October 2018) destroyed most of the course's trees and its irrigation, the club removed the fallen trees, rebuilt the irrigation system and tore up and rebuilt all of the greens. Tees were moved farther back to offset the loss of the trees.
Sources: WJHG, Panama Country Club in the midst of major reconstruction following damage from Michael · Club + Resort Business, Panama CC Reopens Course Ten Months After Hurricane's Destruction
Completed2017–2019
Orono, ME
Tees and fairways
Resurrection Golf (in-house), Dan Allen, superintendent (in-house)
Described as a renovation by Resurrection Golf (Sean McCarthy), in Mainebiz
About 60 percent of the fairways, dead after years of neglect, were rototilled, had their soil profile reset and were regrown from seed. New tees were added and others enlarged in 2018.
Sources: Bangor Daily News, New ownership group making improvements to Penobscot Valley Country Club · Bangor Daily News, Penobscot Valley Country Club up for auction · Mainebiz, Bangor businessman buys Orono golf course
Completed2019
Cinnaminson, NJ
Bunkers
Tyler Rae
Described as a restoration by the club
Second phase of the club's Donald Ross restoration, covering four holes.
Sources: Riverton Country Club, Donald Ross Restoration · Patrick Koenig, Riverton Revitalization
Completed2016–2019
Juno Beach, FL
Bunkers, tees and trees
Coore and Crenshaw, Jeff Bradley (associate)
Described as a restoration by Golf Course Architecture
Coore & Crenshaw restored the open sandy areas between holes, removed hundreds of pines, palms and palmettos, and rebuilt Seminole's bunkers over three summers, starting with 29 bunkers on the 12th, 13th and 14th. LINKS reported a remit to add 250 yards of back-tee length before the 2021 Walker Cup. The bunkers deteriorated within a few years.
Sources: Golf Course Architecture, Three year plan for restoration of Ross's Seminole · LINKS Magazine, Seminole Prepares for the 2021 Walker Cup · Golf Course Architecture, Seminole: Bearing fruit (bunker work dated 2018-19) · Golf Course Architecture, Seminole: Keeping pace with change (bunkers rebuilt six years before 2025)
Completed2018–2019
Arlington, VA
Greens, bunkers, tees, trees and routing
Renaissance Golf Design, Eric Iverson, Tom Doak, Mike McCartin (associate), Blake Conant (associate), LaBar Golf Renovations (builder), Corey Haney (in-house)
Described as a renovation by the architect (Eric Iverson, in Golf Course Architecture) and the club
Whole-course renovation and re-grassing with all-new greens, tees and bunkers, using Flynn-era photos and aerials as a reference, plus tree removal. Routing changes added a par-3 6th after the old 5th, removed the old par-3 9th to lengthen the 10th into a par 5, and substantially changed the par-4 15th (formerly a par 5). The Turn halfway house and learning center was added.
Sources: Golf Course Architecture, 'Renaissance in progress with Washington G&CC renovation' · Golf Club Atlas forum: Tom Doak (3 Jul 2019) and Alex Bullock (9 Nov 2020) · Washington Golf & Country Club, 'A Special History' · McCartin Golf Design project page
Completed2018
Bradenton, FL
Greens, bunkers, tees and fairways
Tony Jacklin
Over seven months, overseen by Tony Jacklin, every green was replaced with TifEagle, bunkers redrained and resanded, fairways and roughs regrassed, tees rebuilt and six large waste areas added to recapture the original Ross design.
Source: Joe Barks, "Donald Ross Signature Course at Bradenton (Fla.) CC Reopens," Club + Resort Business
Completed2018
Sarasota, FL
Greens, bunkers and tees
Kris Spence, Jim Harbin (associate), Steve Coe
Described as a restoration by the architect, the club and Golf Course Architecture
Kris Spence restored greens and bunkers from Ross's drawings: almost every green lowered 12-14 inches and recontoured, greenside bunkers cut tighter, fairway bunkers raised, all bunkers rebuilt with drainage and liners. The April 2018 plan also called for five new teeing areas, tapered approaches and enlarged practice areas.
Sources: Golf Course Architecture, Restoration of Donald Ross's Sara Bay course to begin this month · Golf Course Architecture, Sara Bay reopens following restoration of Donald Ross course · Sara Bay Country Club, History
CompletedFrom 2018
Boardman, OH
Bunkers
All 42 North Course bunkers were rebuilt, one nine closed at a time, following the 36-bunker rebuild on the South.
Source: The Vindicator, "Mill Creek unveils overhauled bunkers"
Completed2016–2018
Columbus, OH
Greens, bunkers, tees, fairways and trees
Kevin Hargrave, Keith Foster
Described as a renovation by Kevin Hargrave
From Keith Foster's 2011 master plan, carried out by his associate Kevin Hargrave, every bunker was rebuilt, some greens and surrounds reworked, fairways expanded (the 3rd nearly doubled), drainage replaced, native areas added and more than 1,500 trees removed. The front nine was done in autumn 2016 and the back nine from September 2017.
Sources: Sean Dudley, "Columbus Country Club renovation reaches halfway point," Golf Course Architecture · Sean Dudley, "Columbus CC course to reopen this May following renovations," Golf Course Architecture · Columbus Country Club, Course Renovations
CompletedFrom 2017
Lakewood, CO
Greens, bunkers, tees, fairways and trees
Gil Hanse, Jim Wagner (associate)
Described as a restoration by the club (history: 'renovation ... restoring the course to Donald Ross's 1916 design'); BusinessDen and Colorado AvidGolfer call it a restoration project
Gil Hanse relocated and reconstructed eight holes, with new bunkers, and added tees on five holes for 190 more yards. Named changes: a new back tee, repositioned bunkers and longer green at the 1st; a longer 4th with its green moved left; the 5th tee moved back; trees removed, two fairway bunkers added and the green moved about 60 yards back over Lakewood Gulch at the 6th; and the 10th green moved north.
Sources: Lakewood Country Club, History · Tom Ferrell, "A Shadow of Hanse at Lakewood Country Club", Colorado AvidGolfer, Fall 2017 (scans on Hanse Golf Course Design news page) · Kate Tracy, "Lakewood Country Club tees up $1.5M course upgrade", BusinessDen · Top100GolfCourses, Lakewood Country Club - Colorado
Completed2018
Newtown Square, PA
Greens, bunkers, tees, fairways and trees
Gil Hanse, Jim Wagner
Described as a restoration by the Philadelphia Inquirer
Gil Hanse and Jim Wagner rebuilt the course shown in Dallin's 1929 aerial photographs over two closed seasons: about 176 bunkers on new bases, greens returned to their early size (nearly 30,000 sq ft recovered), fairways widened about 20 percent, trees removed and 13 tees reshaped.
Sources: Joe Juliano, "Aronimink restoring its course as 2018 PGA Tour event nears," Philadelphia Inquirer (via Hanse Golf Course Design) · Frank Fitzpatrick, "The World War I flier behind Aronimink's restoration," Philadelphia Inquirer
Completed2018
Augusta, GA
Greens, bunkers, fairways, trees and routing
Brian Silva
After the 2017 land sale to Augusta National, Brian Silva rerouted the 9th into more of a dogleg with a new green up and left of the old one and fine-tuned the bunkering. The fairways were converted to zoysia and hundreds of trees removed the same year.
Sources: Derek Duncan, "With Always A Finger On The Pulse," Golf Georgia · Stan Awtrey, "A Classic Returns," Golf Georgia
Completed2018
Coral Gables, FL
Greens, bunkers and tees
Brian Silva
Described as a restoration by Golf Course Architecture
Working from Ross's 1925 plans found at the Tufts Archives, Brian Silva added 14 bunkers, enlarged the greens to their original outlines, regrassed the course with bermudagrass and added back tees taking it from 6,772 to 7,112 yards.
Sources: Richard Humphreys, "Silva leads restoration of Ross course at Biltmore," Golf Course Architecture · Tim Gavrich, "Renovation at Miami's Biltmore Golf Course brings Donald Ross design back to life," GolfPass
Completed2018
Palm Beach, FL
Greens, bunkers, tees and trees
Rees Jones, Steve Weisser (associate), Landscapes Unlimited (builder)
Described as a redesign by the Palm Beach Civic Association
Rees Jones and Steve Weisser stripped the course to bare earth and rebuilt every tee, green and fairway bunker complex: greens enlarged by almost 50 percent with backstop slopes, bunkering cut to about two-thirds, paspalum turf, the eastern part raised and trees thinned.
Sources: Palm Beach Civic Association, "The Breakers Golf Course Undergoing Complete Re-Design" · Toby Ingleton, "The Breakers Ocean course: Great expectations," Golf Course Architecture
Completed2018
Mobile, AL
Greens, bunkers, trees and routing
Jerry Pate, Steve Dana (associate), Brad Klein (consultant)
Described as a renovation by the club
On Brad Klein's recommendations, Jerry Pate and Steve Dana rebuilt the bunkers, recaptured green pads with new greens, removed about 1,300 trees, reversed the 2nd, 10th, 17th and 18th and moved the 16th onto land reclaimed after a sewer project.
Sources: Country Club of Mobile, Golf · Steve MacQuarrie, review of Country Club of Mobile, Top100GolfCourses
Completed2018
Elk Rapids, MI
Bunkers, tees and fairways
Bruce Hepner
Bruce Hepner's master plan, drawn from Ross's illustration, relocated bunkers, adjusted tees (two paid for by a Donald Ross Society Foundation grant) and set new fairway mowing patterns. Later grants paid for tree removal along the 6th (2020) and a native-grass area (2021-22).
Sources: Marc Schollett, "Golf course finally complete 96 years after construction began," UpNorthLive · Donald Ross Society, "Elk Rapids GC finally complete 96 years later"
Completed2018
Winston-Salem, NC
Greens and bunkers
Kris Spence
Described as a renovation by Triad Golf Magazine
Kris Spence returned about a decade after his Ross restoration to convert the greens from bentgrass to bermudagrass and remodel the bunkers. Green areas on the 1st, 6th, 9th and 15th were adjusted.
Sources: Triad Golf Magazine, "N.C. Open begins Tuesday at Triad club" · Triad Golf Magazine, "Forsyth CC to host N.C. Open"
Completed2017–2018
Toledo, OH
Greens, bunkers, tees, fairways, trees and routing
Andrew Green, McDonald and Sons Golf Course Builders (builder), John Zimmers (in-house), Michael Kuhn, Jr. (consultant)
Described as a restoration by the club, Golf Course Architecture and Bradley S. Klein
Three holes built for the 1979 U.S. Open were replaced by new holes (today's 3, 4 and 5) on a former farm field, modelled on Ross's lost 8th, 7th and 13th; the 8th got a new green and the 2nd green was pushed back 100 yards. Bunkers were rebuilt course-wide from archive material, greens expanded, fairways widened, trees removed and new back tees added. Green expansions on 11, 14 and 17 were deferred until after the 2019 U.S. Junior Amateur.
Sources: Golf Course Architecture, 'Elements of original Ross design being restored at Ohio's Inverness Club' · GCM, 'Intentions at Inverness' · Golf Course Architecture, Andrew Green interview · Bradley S. Klein, The First Call, 'Inverness Club: lessons from a proper course restoration' · Inverness Club, Andrew Green
Completed2018
Newport, RI
Bunkers
Gil Hanse, Gil Hanse's shaper (builder)
After the board brought in Gil Hanse in summer 2017, his shaper made subtle changes to five fairway bunkers in spring 2018: three on the 2nd hole and two on the 6th.
Source: Newport Country Club, Our History
Completed2018
St. Clair, MI
Tees
The club added Ross tees and orange tees, and created a par-3 layout. The orange set plays 3,065 yards.
Source: St. Clair Golf Club, Our History
Completed2018
Marblehead, MA
Greens, bunkers, fairways and trees
Ron Forse, Peter Hasak (in-house)
Described as a renovation by the club
Ron Forse's master plan, begun in 2016, redesigned and repositioned the bunkers (24 new) guided by mid-1920s photographs, brought greens back to full size and widened fairways including the 11th and 14th. It also added fescue and naturalized areas and cleared trees on the clubhouse side of Salem Street.
Sources: Tedesco Country Club, Golf page · Jay Flemma, Golf Course Trades, 'Tedesco Country Club – Opera, Shipwrecks, and Golden Age Golf' · Top100GolfCourses, Tedesco
Completed2017
Orlando, FL
Greens, bunkers and trees
Ron Forse, Jim Nagle, Landscapes Unlimited (builder)
Described as a renovation by Ron Forse
Ron Forse and Jim Nagle reconstructed all 18 holes: every green rebuilt and raised, new bunkers, many trees removed, drainage re-engineered, irrigation replaced and the course regrassed. Forse called it a renovation, even a redesign in the Ross style; the routing was kept.
Sources: Golf Course Architecture, "Positive feedback for Forse Design's work at CC of Orlando" · Graylyn Loomis, "Country Club of Orlando - A Renovation Lesson for Classic Clubs," LINKS Magazine
Completed2016–2017
Kennett Square, PA
Course work
Kennett Square G&CC grounds staff (in-house)
The pond in front of the 11th green was converted to a bio-filter wetland with a log-lined stream channel, stone walls, a rock spillway and native planting. Work was done by the grounds crew.
Sources: KSGCC grounds blog, "#11 pond conversion project" · KSGCC grounds blog, "Sod work complete on hole #11" · KSGCC grounds blog, "#11 spillway rock in place"
Completed2016–2017
Asheville, NC
Greens, bunkers and trees
Richard Mandell, Marc Burger, NMP Golf Construction (builder)
Described as a renovation by Golf Course Architecture
Richard Mandell rebuilt all 18 greens in 007 bentgrass, uncovering some original greens buried under later ones and building new Ross-style greens where they could not be recovered, removed trees around green complexes and reworked the bunkering. The first tee was moved for a new practice green and facility.
Sources: Sean Dudley, "Renovations at Country Club of Asheville course reach completion," Golf Course Architecture · Luke Notestine, "Country Club of Asheville has grand reopening ceremony," WLOS
Completed2010–2017
Westfield, NJ
Greens, bunkers, tees, trees and routing
Rees Jones, Steve Weisser (associate)
Described as a restoration by Rees Jones, Inc.
Rees Jones and Steve Weisser's master plan worked through the course from the 12th: a new 5th green, the pond before the 7th removed, rebuilt bunkers, a new 17th green (2015) and widespread tree removal. The last phase ($2.1 million) cut down the hill on the 1st and 2nd and changed the pars of the 2nd to 4th, taking the course from par 72 to 71.
Sources: Rees Jones, Inc., "Echo Lake's Substantial Renovation By Rees Jones Nearly Complete" · New Jersey PGA, "Echo Lake Redesigns its First Four Holes" · Rees Jones, Inc., Echo Lake Country Club
Completed2017
Pittsburgh, PA
Course work
Described as a redesign by the club
The club redesigned the 10th and 18th "in the spirit of Ross's original". It has not published the details.
Source: Edgewood Country Club, Course Tour and Golf
Completed2017
West Hartford, CT
Bunkers, tees and fairways
Bruce Hepner
Described as a renovation by the club
All 132 sand bunkers were renovated, 16 new tees were built and 29 rebuilt, and green collars and fairways were expanded. Bruce Hepner shaped the bunkers and located the new tees. The short-game practice facility was renovated in the same project.
Sources: Hartford Golf Club, Golf page · Hartford Golf Club, Club History ('The golf course completed a major renovation in 2017') · Top100GolfCourses, Hartford (Red & Blue)
Completed2017
Charlotte, NC
Greens
Described as a renovation by Golf Course Industry
TifEagle bermudagrass greens were installed as part of a 2017 renovation, replacing bentgrass. The 12th green was renovated the same year.
Source: Golf Course Industry, "Transition Zone excellence"
Completed2016–2017
Southern Pines, NC
Greens, bunkers, tees and fairways
Kyle Franz
Described as a restoration by the club
Kyle Franz used the summer 2016 closure to convert the greens from bentgrass to MiniVerde Bermuda, then rebuilt every bunker, reshaped the fairways and added tees over the following two winters. About 11 acres of Bermuda rough became native hardpan, wiregrass and straw.
Sources: Pine Needles Lodge & Golf Club, Golf page · Lee Pace, "Eye of the Needles," PineStraw · AmateurGolf.com, "Pine Needles to Host 2022 U.S. Women's Open"
Completed2016–2017
Pinehurst, NC
Bunkers and routing
Kye Goalby, Kyle Franz, Pinehurst director of agronomy Bob Farren (in-house)
Described as a renovation by the club (Pinehurst Resort)
Sandy native areas, wire grass and bunkering were brought back as elements of Ross's original design, including a bunker and native area recovered from a 1930s photograph. After The Cradle short course took the opening holes, two new par-3 holes were built and two other holes reworked to keep the course at 18 holes and par 68.
Sources: Pinehurst Resort, "Vintage charm and strategy are evident in reopened Pinehurst No. 3" (Chris Buie) · Golf Course Architecture, "Donald Ross design characteristics return to Pinehurst No. 3" · Golf Advisor, "Big updates happening in the Carolina Sandhills" · LINKS Magazine, "Pinehurst: Ever Changing, Still the Same" · Golf Club Atlas forum, "Pinehurst #3 Course"
Completed2017
Falmouth, ME
Greens, bunkers and trees
Ron Prichard, Tyler Rae
Described as a restoration by the club
The club restored Ross features: bunkers refurbished, greens expanded and trees removed. No hole-by-hole scope has been published.
Sources: Portland Country Club, Golf page · Top100GolfCourses, Portland Country Club · Golf Course Architecture, The father of restoration · M. James Ward review, Top100GolfCourses
Completed2017
Cinnaminson, NJ
Bunkers
Ron Prichard, Tyler Rae
Described as a restoration by the club
First phase of the club's three-phase Donald Ross restoration, restoring seven holes. The club says it had a major impact on the look and feel of the course.
Sources: Riverton Country Club, Donald Ross Restoration · Golfadelphia, Riverton Country Club · Top100GolfCourses, Riverton
Completed2016–2017
White Plains, NY
Bunkers, tees and trees
Mark Stagg, Peter Waterous (in-house)
Described as a renovation by the club (The Golf Wire release: 'renovation and modernization')
A member-led project added back tees at the 2nd and 16th, widened and lengthened the 14th tee, and added two bunkers at the 15th, where rock outcrops were covered with fescue and the area right of the green was opened up. The release says the course gained more than 100 yards.
Source: The Golf Wire (club/Troon release), Westchester Hills course renovation
Completed2016
Newton, NC
Greens and bunkers
Southeastern Golf (builder), Robert Arrington (in-house), Forse Design (consultant)
Described as a restoration by Carolinas Golf
Southeastern Golf rebuilt the green complexes from Ross's plans with Pure Distinction bentgrass, restored every bunker and moved a few fairway bunkers for modern driving distances. Forse Design lists Catawba among its master plan and restoration clients for 2010–2019.
Sources: Craig Distl, "Pride of Membership: Renovated Catawba Country Club Debuts," Carolinas Golf · Forse Design, Project Portfolio (Past and Present)
Completed2013–2016
Cedar Rapids, IA
Greens, bunkers and fairways
Ron Prichard, Tyler Rae (associate), Tom Feller (in-house)
Described as a restoration by the Corridor Business Journal
Ron Prichard's restoration, shaped by Tyler Rae and built mostly by the club's staff, reclaimed about 17,000 sq ft of putting surface, raised the 6th, 15th and 16th greens out of the flood plain, widened fairways about 35 percent, removed a pond and the cart paths and rebuilt the bunkers in a 1915 style.
Source: Angela Holmes, "CRCC golf course completes Ross-toration," Corridor Business Journal
Completed2015–2016
Coral Gables, FL
Greens, tees and fairways
Kipp Schulties Golf Design, QGS Development (builder), Buzz Jaskela Landscape Architects
Described as a renovation by the club and Golf Course Architecture (Schulties's page calls it a redesign)
Greens rebuilt to USGA specifications and enlarged, fairways recontoured, Celebration bermudagrass planted on fairways and roughs and tees raised 15 to 18 feet. A two-acre and a half-acre lake were added and non-native plants replaced with native ones, alongside a new irrigation system.
Sources: Golf Course Architecture, Kipp Schulties Golf Design to lead renovation of Riviera CC course · Community Newspapers, Riviera Country Club re-opens golf course after renovation · Kipp Schulties Golf Design, Riviera Country Club
CompletedFrom 2016
Reading, PA
Greens
A $3 million project replaced the irrigation system, built a holding pond for water pumped from the river and rebuilt the greens on the 7th, 13th and 15th.
Source: Berkshire Country Club, History (club timeline)
Completed2016
Atlanta, GA
Bunkers, tees and routing
Rees Jones
Changes made with the PGA TOUR in spring 2016: the nines were reversed, the 18th was regraded, bunkers were added on the 12th and 18th and tees on the 16th and 17th.
Source: Rees Jones, Inc., East Lake Golf Club
Completed
Glens Falls, NY
Fairways and trees
Ian Andrew (consultant), Chris Freilinghaus (in-house)
Grassing lines were adjusted, often outside the bunkers, to bring bunkers back into play and restore alternate routes, with minor tree removal. Andrew said in late 2015 that the last adjustments, marked out with superintendent Chris Freilinghaus, would be finished the following year; no source confirms the finish.
Sources: Golf Club Atlas forum, Ian Andrew post · Golf Club Atlas, Glens Falls course profile (Ran Morrissett)
Completed2015–2016
Highlands, NC
Bunkers and tees
Better Billy Bunker (builder), Highlands CC golf maintenance staff (in-house)
Described as a renovation by the club (superintendent's blog, 'Bunker Renovation this fall')
Every bunker rebuilt to the Better Billy Bunker specification, with a polymer-bonded gravel floor and new angular sand in place of the 2004 lined bunkers. The same winter the 5th Jones tee was extended forward behind a new wall and the old 15th Jones tee, last used around 1960, was re-levelled and returned to play.
Sources: Highlands CC Agronomy Blog, 'Bunker Renovation this fall' · Highlands CC Agronomy Blog, 'Wednesday' · Highlands CC Agronomy Blog, 'More from Friday' · Highlands CC Agronomy Blog, '15th tee' · Highlands CC Agronomy Blog, '#5 tees'
Completed2016
Memphis, TN
Greens, bunkers and trees
Kris Spence
Described as a restoration by the architect and Golf Course Architecture
Greens rebuilt to their original fill-pad dimensions from 1930 aerials and ground photographs, recovering more than 35 per cent of lost putting surface, with new rootzone, drainage, TifEagle ultradwarf and irrigation controls. Bunkers reworked, significant tree removal, and about 15 acres of rough converted to fescue.
Sources: Kris Spence Golf Design, Memphis Country Club · Golf Course Architecture, Kris Spence completes restoration of historic Memphis CC course
Completed2015–2016
Mooresville, NC
Greens, bunkers, tees, fairways and routing
Kris Spence, Jim Harbin (associate)
Described as a redesign by the club and Golf Course Architecture
Kris Spence designed a new front nine on the site of Ross's original nine, removing a 16-acre industrial pond, moving holes away from a busy road and widening hole separation. Gibson's back nine was renovated with new greens, tees, bunkers and cart paths and reseeded fairways. New irrigation, drainage, concrete cart paths and about 10.5 acres of practice area were added.
Sources: Golf Course Architecture, "Mooresville GC course reopens following Kris Spence redesign" · Charlotte Observer via WBTV, "Town-owned Mooresville Golf Club reopening after $10M makeover" · Mooresville Golf Club, About Us · Kris Spence Golf Design, Mooresville Golf Club
Completed2016
New Smyrna Beach, FL
Greens
Gary Wintz (in-house)
Described as a renovation by the club
The greens were replanted with Platinum Paspalum, a salt-tolerant grass, in work overseen by general manager Gary Wintz after several years of research. Sports Illustrated reported that the 2016 work also concentrated on drainage.
Sources: New Smyrna Golf Club, Course Details · Florida Department of State, Course of the Month release (Wintz quote) · Sports Illustrated, 'The good shepherd'
Completed2010–2016
Palatka, FL
Greens and bunkers
Bobby Weed Golf Design
Under a city management agreement, Bobby Weed Golf Design tweaked greens and bunkers, converted out-of-play areas to native sandy waste and overseeded with ryegrass in winter, alongside agronomic and operational changes. The firm called its aim reviving the classic Ross features; no hole-by-hole scope was published.
Sources: GOLF.com, How this Donald Ross gem went from peril to profitable at just $29 a round · Bobby Weed Golf Design, Palatka Golf Club project page · Bobby Weed Golf Design press release (reprinted by American Golfer) · Bobby Weed Golf Design press release (reprinted)
Completed2016
Bridgewater, NJ
Bunkers
Described as a renovation by the club (2017 release; the 2016 superintendent release calls it a 'restoration')
The club completed a renovation of the greenside bunkers on its 18-hole course in 2016. No architect or builder is named, and no hole-by-hole scope was published.
Sources: Golf Course Trades, Raritan Valley Country Club hires Richard Tacconelli as superintendent · Golf Course Trades, Raritan Valley Country Club Undergoes Golf Course Restoration and More · Patch Bridgewater, RVCC revitalized (club release)
CompletedFrom 2016
Peabody, MA
Greens, bunkers, tees and fairways
Eric Iverson
Described as a restoration by the USGA
A multiyear restoration led by Eric Iverson from 2016 restored Ross's bunkers and fairway lines, added flexible teeing grounds and championship length, and brought back original green shapes. Golf Digest puts its cost at $3.5 million.
Sources: USGA release via The First Call, Salem Country Club selected to host three future USGA championships · Golf Digest, Salem Country Club course page
Completed2015
Peabody, MA
Greens, tees and trees
Ron Forse, Kip Tyler (in-house)
Described as a restoration by the Boston Globe
Ron Forse led a restoration that enlarged most of the 18 greens and returned all of them to Ross's specifications, working from the club's period drawings, plans and photographs. About 500 trees were removed. Forse said a recommendation to lengthen the 9th was accepted in fall 2015.
Sources: Boston Globe, golf notes · Boston Globe, Why is Salem Country Club located in Peabody? · Top100GolfCourses, Four holes to watch at Salem Country Club
Completed2015
Savannah, GA
Greens, bunkers and routing
Richard Mandell
Richard Mandell reassembled the surviving Ross holes, split across three nines since 1985, into a single eighteen, working from Ross's master plan, hole drawings and the 1951 and 1971 aerials.
Source: ASGCA, "Mandell, ASGCA, updates Ross design at Georgia's Bacon Park"
Completed2014–2015
Canton, MA
Greens, bunkers, tees and trees
Brian Silva
Described as a restoration by The Boston Globe (2014: 'the Ponkapoag restoration'); the DCR called it a renovation project (Globe 2015)
Drainage repairs and the return to play of nine holes (3-8 and 11-13) closed by flooding since 2003, following Ross's handwritten plans. All 18 tees were rebuilt, bunkers were remapped from the original sand lines, greens and bunkers were returned to their original shapes, and hazardous trees and overgrowth were removed. New wetland areas were added along several fairways under an agreement with the Town of Canton.
Sources: The Boston Globe, 'Ponkapoag's restoration honors Donald Ross' · The Boston Globe, 'Nation's oldest public golf course reopens in Canton' · Golf Course Architecture, 'Investment in Massachusetts courses' · Golf Club Atlas forum, 'Ponkapoag #1 in Canton, MA'
Completed2014–2015
Asheville, NC
Greens, bunkers, tees and fairways
Brian Silva
Described as a renovation by Golf Course Architecture
Brian Silva's eight-month project reworked the greens from Ross's plans and early photographs, recovering lost green space and softening the most severe ones, rebuilt all the bunkers and restored a few lost ones, and replaced irrigation, drainage and turf (A-1 bentgrass greens, zoysia tees and fairways).
Sources: Sean Dudley, "Course at Biltmore Forest Country Club reopens following renovation work," Golf Course Architecture · Biltmore Forest Country Club, About the Club
Completed2013–2015
Carbondale, PA
Greens, bunkers, tees and trees
Described as a restoration by the Pocono Turfgrass Association
A three-year programme to return the course toward Ross's design put drainage into every green, rebuilt the bunkers in three phases, removed trees, reshaped the greens of two signature holes (fall 2014) and levelled and added tees. No architect is named.
Sources: Pocono Turfgrass Association, Chips & Putts, July 2014 · Pocono Turfgrass Association, Chips & Putts, September 2015
Completed2014–2015
Troy, OH
Bunkers
Miami Shores turf staff (in-house)
Described as a renovation by the club (superintendent's turf blog)
The turf staff rebuilt the course's bunkers in place: old sand stripped, a drain dug to gravel and filled with stone, the clay base compacted and new white sand added to USGA depths. The right bunker on the 10th was done and the back bunker on the 14th grassed over in winter 2013-14; the 9th hole's bunkers followed from late 2015.
Sources: Miami Shores GC Turf Management blog, "We are doing a few projects on the golf course" · Miami Shores GC Turf Management blog, "Welcome to the 2015 season at MSGC" · Miami Shores GC Turf Management blog, post of 29 June 2015 (bunker renovation completed) · Miami Shores GC Turf Management blog, post of 8 March 2016 (9th bunkers)
Completed1999–2015
Edison, NJ
Greens, bunkers, tees, fairways and trees
Gil Hanse
Described as a restoration by the USGA, The Met Golfer and the club ("renovation and restoration")
Gil Hanse's first master plan, carried out in phases from 1999. More than 1,200 trees were removed, lost Ross bunkers recovered, 16 greens expanded toward their original size, 12 tees lengthened, chipping areas added and the 10th-hole pond returned to a creek; the three Tunnel holes (13-15) were reworked.
Sources: The Met Golfer, "Nothing Plain About It" · USGA announcement (republished by Links Nation) · Plainfield Country Club, About Us · Plainfield Country Club, Course Overview (Hanse hole notes) · Golf Course Industry, "It just oozes history"
Completed2014–2015
Houston, TX
Greens, tees, fairways and routing
Tom Fazio, Logan Fazio
Described as a renovation by Golf Course Architecture
Tom and Logan Fazio renovated the 18-hole course, building three new holes, expanding the driving range and adding a short-game area. All playing surfaces were stripped and regrassed (Celebration bermudagrass; MiniVerde greens), elements of the layout were reshaped, and cart paths and irrigation were replaced.
Sources: Golf Course Architecture, Tom and Logan Fazio leading renovation of River Oaks Country Club course · ASGCA, Fazio, ASGCA leads renovation of Ross-designed River Oaks Country Club · Top100GolfCourses, River Oaks (renovated by Fazio Design in 2015)
Completed2013–2015
Bronxville, NY
Greens, bunkers, fairways and trees
Mike DeVries
Described as a restoration by the architect (DeVries Designs) and the club
Course-wide restoration from a 2007 long-range plan: lost green margins and hole locations recovered, traditional mowing patterns re-established, bunkers rebuilt, trees and waterways managed. The 6th green was moved and rebuilt in 2014 and the 16th hole was refashioned with new fairway bunkers and a recontoured green.
Sources: DeVries Designs, Siwanoy Country Club · DeVries Designs, Siwanoy CC Restoration Complete Spring 2015 · DeVries Designs, Brad Becken mentions Siwanoy on 'Morning Drive' · Clayton DeVries & Pont, Siwanoy Country Club · M. James Ward, Grade A Architecture: Siwanoy Country Club (Golf Today)
Completed2015
St. Clair, MI
Tees
The club added member tees and forward yellow tees.
Source: St. Clair Golf Club, Our History
Completed2008–2015
Wayne, PA
Greens, bunkers, fairways and trees
Ron Prichard, Peter Conlan and the Restoration Committee
Described as a restoration by the club
Under Ron Prichard's guidance the club restored the course a few holes each year, starting with holes 4-8. Greens and fairways were expanded, trees removed and bunkers rebuilt and sometimes moved.
Sources: St. Davids Golf Club, The History of St. Davids Golf Club Through the Years (2023) · St. Davids Golf Club history (March 2009, GAP-hosted) · Golfadelphia, St. Davids Golf Club
Completed2014–2015
Philadelphia, PA
Greens, bunkers, tees, fairways and trees
Stephen Kay, Tim Malone of Guaranteed Landscaping, Inc. (builder), Brad Klein (consultant)
Described as a restoration by Golf Course Architecture; the architect ("sympathetic restoration")
Stephen Kay restored all bunkers and tees, returned all 18 greens to their original size, widened fairways and removed more than 250 trees, working from early aerial photographs. New back tees added more than 200 yards, and some bunkers added after Ross were removed.
Sources: Golf Course Architecture, Golfers enjoying restored course at Philadelphia’s Union League Golf Club · Club + Resort Business, Improvements in Full Swing at The Union League Golf Club at Torresdale
Completed2012–2015
Lafayette Hill, PA
Greens, bunkers and trees
Andrew Green, McDonald & Sons (builder), Tony Gustaitis (in-house)
Described as a renovation by Top100GolfCourses ('sympathetic renovation'); the club superintendent ('bunker renovation project'). Andrew Green calls the job he was first hired for a 'flood plain renovation'.
A phased project rebuilt the course's bunkers, removing some and reshaping or combining others, and reworked several greens and approaches. Top100GolfCourses says the greens were expanded to their original sizes and trees were removed. Green says the bunkers kept the West Coast style the club had adopted in the late 1990s.
Sources: WVCC Greens blog (Tony Gustaitis), 13 December 2013: Phase I from 6 December 2012, Phase II from mid-October 2013 · WVCC Greens blog (Tony Gustaitis), October-December 2014: McDonald & Sons crew on the 6th, 7th and 8th · Top100GolfCourses, Whitemarsh Valley · BuffaloGolfer.com, 2018 Interview Series: Andrew Green · LINKS Magazine, The Greening of Oak Hill
Completed2015
Boston, MA
Greens and bunkers
Described as a redesign by Boston Herald (photo caption: 'was redesigned'; headline: 'Renovation')
The 11th green complex was rebuilt and enlarged by about 40 percent. The back bunker was removed and the two front bunkers were redesigned and moved toward the centre. The city's course tour describes the green complex as completely renovated.
Sources: Boston Herald, "Renovation takes Devine's 11th in different direction" · City of Boston Golf, William J. Devine Course Tour
Completed2014
Wilmington, NC
Greens, bunkers and fairways
John Fought, Duininck Golf (builder)
Described as a restoration by the ASGCA
John Fought restored the course toward Ross's design, roughly doubling the greens back to their original sizes, rebuilding the bunkers and expanding the short grass. Duininck Golf built it during a May to October closure.
Sources: ASGCA, "Fought, ASGCA, restoring Ross course in North Carolina" · Port City Daily, "Despite rain, Muni golf course renovation on schedule"
Completed2014
Jeffersonville, PA
Bunkers
Jeffersonville grounds crew (in-house)
Described as a restoration by the club
The grounds crew rebuilt the surrounds of the 13th green: the approach was expanded, collection areas added on the left and behind the green, the right bunker reshaped and the left bunker enlarged and deepened. About 15,000 square feet of tall and fine fescue sod was laid.
Source: Jeffersonville GC maintenance blog, "13th Green Surround Restoration"
Completed2014
Gainesville, FL
Greens, bunkers and trees
Scot Sherman, ASGCA
Described as a renovation by ASGCA and Golf Course Architecture
All greens were stripped, recontoured and regrassed with Champion ultradwarf bermudagrass, and bunkers were rebuilt with many redesigned. The project also renovated the team practice area, upgraded irrigation and removed some trees for playability and shade.
Sources: ASGCA, "University of Florida's Bostick Golf Course renovation completed by Sherman, ASGCA" · Golf Course Architecture, "Sherman returns to renovate Mark Bostick course at University of Florida"
Completed2014
Fort Myers, FL
Greens, bunkers, tees, fairways, trees and routing
Steve Smyers, Patrick Andrews (associate)
Described as a renovation by Florida Department of State (Florida Historic Golf Trail)
City-funded rework of the whole course built around storm-water retention: ponds, dry detention areas and creeks along the canal, regraded fairways, and new Celebration and ultradwarf Bermuda turf. The 5th was moved away from the Tamiami Trail, the 4th's angle shifted and the 12th changed from a par 4 to a short hole; par went from 71 to 70 for men.
Sources: Steve Smyers Golf Course Architects, 'Updating Fort Myers Country Club' · Florida Historic Golf Trail: Fort Myers Country Club · Florida Dept. of State press release · Sports Illustrated (Len Ziehm) · Golf Club Atlas thread (April 2014 closure)
Completed2014
Toledo, OH
Greens
Shawn Smith
A twelve-month project to regrass the course and restore the shape of Ross's greens, led by Arthur Hills's associate Shawn Smith.
Source: Golf Course Architecture, Andrew Green interview
Completed2014
West Caldwell, NJ
Greens and bunkers
Ron Prichard
Described as a renovation by the club
The club says the 2014 renovations brought the 7th green back to Ross's original field sketch, which shows a notch at the top of the green with undulations two and a half feet high. GOLF.com (2019) reports Prichard restored the green, which had become a punchbowl.
Sources: Mountain Ridge Country Club, Course Tour hole 7 · GOLF.com, Where I played: Mountain Ridge Country Club
Completed2014
Pinehurst, NC
Greens
Pinehurst Resort grounds and golf course maintenance (in-house)
Putting surfaces converted from bentgrass to Champion ultradwarf bermudagrass after the 2014 U.S. Open and U.S. Women's Open. Planted no-till from 30 June with no excavation or contour changes; the course reopened after a roughly ten-week closure.
Sources: Golf Course Architecture, Pinehurst reopens No. 2 with new Champion bermuda greens · GolfPass, Pinehurst Resort reopens No. 2 golf course with bermuda grass · Golf Course Architecture, Pinehurst to convert No. 2 greens
Completed2013–2014
Absecon, NJ
Bunkers and tees
Described as a renovation by the club
New back tees on the 4th, 5th, 10th and 12th added about 150 yards, and a new bunker complex was built between the 4th and 5th to work with the new back tee on the 5th. All existing tees were rebuilt.
Sources: Stockton Seaview press release, 'New-Look Bay Course Debuts' · Stockton Seaview press release, 'To Tee-Off New Era With Bay Course Renovation' · GolfPass, Deegan
Completed2013
Cincinnati, OH
Bunkers, tees, fairways and trees
Tim Liddy (consultant), Course Crafters LLC (builder), Hyde Park grounds staff (in-house)
Described as a renovation by the club
The 13th was reworked over about five weeks: existing tees renovated, new championship and forward tees added, eight bunkers totalling 8,000 square feet added, the fairway recontoured and the cart path shifted. About two acres were seeded to fine fescue.
Sources: Hyde Park G&CC Grounds blog, "Hole 13 Renovations" · Hyde Park G&CC Grounds blog, "13 Renovation Complete" · ASGCA, Liddy master planning article
Completed2012–2013
Southern Pines, NC
Greens, bunkers, tees, fairways and trees
Kyle Franz
Described as a restoration by the club
Kyle Franz rebuilt bunkers, uncovered abandoned features, replaced rough with sandy waste areas and wiregrass, and expanded fairways and greens to their former size using a 1939 aerial, recapturing about 15,000 sq ft of putting surface and reworking the non-Ross 8th and 9th greens. Greens were converted to MiniVerde ultradwarf bermuda, about 400 trees were removed and new back tees were added on several holes.
Sources: Mid Pines Inn & Golf Club, Golf page · AmateurGolf.com, "Mid-Pines restoration underway" · AmateurGolf.com, "Mid Pines Golf Club Review: Examining the restoration" · Golf Club Atlas, Mid Pines feature review · The Fried Egg, Mid Pines Golf Club profile
CompletedFrom 2013
Evergreen Park, IL
Greens and trees
Ron Prichard
Described as a restoration by Golf Club Atlas (Andrew Lewis)
The second phase of Ron Prichard's restoration felled several hundred more trees and finished the green expansion begun in the first phase (2004).
Source: Ran Morrissett, "Feature Interview with Andrew Lewis," Golf Club Atlas
Completed2012–2013
Williamsville, NY
Greens, bunkers, tees and fairways
Forse Golf Design, Aspen Corporation (builder)
Described as a restoration by the club
Forse Design, with Aspen Corporation building from Ross's blueprints and a 1927 aerial, rebuilt or realigned 68 tees, built 113 bunkers (105 in their original places), restored 17 fore bunkers, widened fairways to their original width, returned every green to its 1926 size and shape and replanted 6.5 acres of native grass. The 4th became a par 4.
Sources: Country Club of Buffalo, Golf · Jim Nagle, "The Country Club of Buffalo," Golf Club Atlas
Completed2012–2013
Deal, NJ
Bunkers
Rees Jones, Bryce Swanson (associate)
Described as a restoration by NJ Golf (NJSGA)
From the club's 2012 master plan, Rees Jones and Bryce Swanson rebuilt all of the course's 100-plus bunkers: deepened, redrained, refilled, given natural edges and in some cases moved, with new bunkers on the 3rd, 17th and 18th.
Sources: NJ Golf (NJSGA), "Restoration At Deal G. & C.C. By Rees Jones Is Complete" · Rees Jones, Inc., Deal Golf & Country Club
Completed2013
Delray Beach, FL
Greens, bunkers, tees and trees
Pete Dye
Described as a renovation by The Coastal Star; the club
Dye's second phase repeated the front-nine work on the back nine (drainage, tees, bunkers, green recontouring, Celebration bermudagrass), cut the sea grapes along the 18th fairway to open ocean views, and built a new 18th green. Dye projected 7,100 yards from the tips with five sets of tees.
Sources: Steve Pike, 'Gulf Stream: Dye hard at work on golf course overhaul', The Coastal Star · Nelson Caron, 'Pete Dye Visit and the Florida Swing', TFP Agronomy blog · Obituary: Paul 'Pete' Dye Jr. (club statement: renovation in 2012-13), The Coastal Star
CompletedFrom 2013
Jeffersonville, PA
Bunkers, fairways and trees
Rich Schilling (in-house), Tyler Rae
Described as a restoration by GOLF.com
An in-house program led by superintendent Rich Shilling began in 2013 with a bunker restoration on the 3rd, shaped with Tyler Rae, who later helped on similar work on the 5th and 17th. Over the following decade the crew removed hundreds of trees, built bunker complexes and simplified fairway cut lines.
Sources: GOLF.com, Jack Hirsh, "How this $80 Ross muni transformed into a Philadelphia gem" · PhilaGolf, "A Model Muni: Jeffersonville Golf Club"
Completed2013
Dayton, OH
Tees
An additional tee was added on each of the 6th, 9th and 12th, lengthening the holes. The nomination says the additions did not alter the holes' original design features.
Source: National Park Service, NRHP Registration Form, Miami Valley Golf Course and Clubhouse
Completed2013
Bloomfield Hills, MI
Bunkers, tees, fairways and trees
Hills & Forrest, Arthur Hills, Steve Forrest, Shawn Smith, ASGCA Associate (associate), Oliphant Golf Construction (builder)
Described as a renovation by the architect (Hills & Forrest; Hills-Forrest-Smith portfolio); Golf Business News called the master plan 'renovation and restoration'
All tee complexes rebuilt and squared and more than 300 yards added; 30 bunkers (about half) rebuilt and some relocated; fairways widened and trees removed. In the peat valley under holes 14-16 the pond on the 15th was relocated with a seawall, the low areas sand-capped and drained, and the 15th and 16th redesigned (club), in the numbering used before 2019.
Sources: Oakland Hills CC, Timeline (2013 entry) · Golf Business News, Hills & Forrest complete renovation of the North Course at Oakland Hills · ASGCA By Design, Winter 2014, p.16 · Hills-Forrest-Smith portfolio, Oakland Hills C.C. (North)
Completed2013
Highland Park, IL
Bunkers and tees
J. Drew Rogers, Dave Zinkand (associate)
Described as a restoration by the architect (J. Drew Rogers)
Greenside bunkers rebuilt in spring 2013 and the remaining greenside and fairway bunkers in fall 2013, with the torn edges and rugged faces described in Colt's notes. Tees were added and short-grass extensions created around a number of greens.
Sources: J. Drew Rogers, Old Elm Club project page · Golf Course Architecture, A legendary collaboration at Chicago's Old Elm Club
Completed2013
Savannah, GA
Greens, bunkers and tees
head superintendent Michael Carn and his staff (in-house), a golf architect from Charlotte, N.C. (consultant)
Described as a renovation by Savannah Morning News
All 18 greens were rebuilt with Champion dwarf Bermuda grass and new grass planted around them; 12 bunkers were redone and green shapes accentuated. Several tees were rebuilt and new ones added, including a 5th tee that straightens and lengthens the hole and an 8th tee that let the former 8th play as a par 4 or 5.
Sources: Savannah Morning News, Renovations take Savannah Golf Club back to original design · Golf Course Trades (republication) · GSGA Georgia Mid-Amateur results (May 2013 event at the club)
Completed2011–2012
Roaring Gap, NC
Greens, bunkers, tees and trees
Kris Spence, Spence Golf (builder)
Described as a restoration by Golf Course Architecture and the club's superintendent ("Restoration Year 2")
Kris Spence restored all 18 greens to their original dimensions, removing decades of built-up topdressing and relaying each green's own turf, and rebuilt most original bunkers, including fairway cross bunkers. Tees were levelled and squared with new back tees on the 8th and 15th, trees were removed (including a row of pines between the 15th and 16th), and irrigation and drainage were replaced.
Sources: Roaring Gap Club Golf Maintenance blog, 2011 posts · Roaring Gap Club Golf Maintenance blog, 2012 posts · Golf Course Architecture, Spence completes Roaring Gap resto · Golf Club Atlas, Roaring Gap course profile
Completed2011–2012
Philadelphia, PA
Greens, bunkers, tees and fairways
Keith Foster, PCC's staff (in-house)
Described as a restoration by the club (Director of Grounds Dan Meersman)
Bunkers were rebuilt to their uncovered original perimeters with grass faces, greens were expanded in-house (the 1st by more than 40 percent) and the 9th green's square corners restored. The 1st tee was returned to its original line, the fairways converted to zoysiagrass and a new irrigation system installed.
Sources: Dan Meersman, PCC grounds blog, "St. Martins Restoration" · Philadelphia Cricket Club, staff page: Daniel L. Meersman · Golf Club Atlas forum, "PCC St. Martins - Info" · Philadelphia Cricket Club grounds blog, "St. Martins Complete!"
Completed2012
Highland Park, IL
Greens, bunkers and fairways
Dr. Hurdzan
Described as a renovation by the club (superintendent's blog)
The greens on Red 3 and Red 9 were rebuilt larger to Dr. Michael Hurdzan's design, with new bunkering around both; the Red 3 front bunker was removed. Fairway bunkers on Red 3 and Red 5 were reduced and the Red 3 fairway widened. Temporary greens were used on the two holes into the next summer.
Sources: Northmoor CC operations blog, Golf Course Update and Red Nine Greens Renovation Updates · Northmoor CC operations blog, Golf Course News
CompletedFrom 2012
Pinehurst, NC
Greens and routing
Bill Coore
The greens were converted from Penn G-2 bentgrass to MiniVerde ultradwarf Bermuda. A new par-3 9th, recommended and designed by Bill Coore, was built, the old par-3 18th was taken out of play and the par-5 17th became the closing hole.
Sources: Golf Course Architecture, "Bermuda greens for Pinehurst No. 1" · Triangle Golf, "Pinehurst to convert No. 1 greens to Bermuda"
Completed2012
Camden, SC
Greens and tees
Kris Spence
Described as a renovation by Golf Club Atlas
Kris Spence regrassed the greens with MiniVerde and recontoured several to recover hole locations, returned the 14th to a par 4, lengthened the 7th into a par 5, restored the 11th green and bunker, added about 150 yards of back tees and replaced rough with sandy natural areas.
Source: Golf Club Atlas, "Camden Reopening Today! Kris Spence Renovation"
Completed2011–2012
Kennett Square, PA
Fairways
Skelly and Loy Inc., Todd Moses (associate), Paul Stead, CGCS (in-house), Flyway Excavating (builder)
Described as a restoration by Golf Course Management (stream corridor restoration)
Restoration of the East Branch of Red Clay Creek through the east end of the course: a quarter-mile reconnected to a 10-20 foot floodplain, boulder banks, willow spiling behind the 15th green, a daylighted tributary and a native riparian buffer. The 14th fairway was reconstructed as part of the work.
Sources: Paul Stead and Todd Moses, "Stream of conscience", Golf Course Management · USGA, Red Clay Creek Restoration BMP case study
Completed2007–2012
Ann Arbor, MI
Greens, tees and trees
Ron Prichard, Joe Hancock
Described as a restoration by the USGA
Ron Prichard led the restoration: the superintendent expanded the greens to Prichard's sketches from 2007, the five greens altered in the 1960s were fully restored in 2012, length was added and trees removed in stages over the following five years.
Sources: USGA, 2026 U.S. Senior Women's Open fact sheet · Steve Salmen and Joe Hancock, "Barton Hills CC Ann Arbor, Mi Pics," Golf Club Atlas
Completed2012
Delray Beach, FL
Greens, bunkers and tees
Pete Dye
Described as a renovation by The Coastal Star; the club
Pete Dye renovated the front nine first: drainage, tee moves, bunker rebuilding and recontouring of greens that tilted steeply back to front, with paspalum on fairways and tees replaced by Celebration bermudagrass.
Sources: Steve Pike, 'Gulf Stream: Dye hard at work on golf course overhaul', The Coastal Star · Obituary: Paul 'Pete' Dye Jr. (club statement: renovation in 2012-13), The Coastal Star
CompletedFrom 2011
Richmond, VA
Greens and bunkers
Kris Spence
Described as a restoration by the architect, Kris Spence (Golf Club Atlas, 2012); Richmond BizSense called it a renovation
The greens were enlarged by about 30 percent and reseeded and the greenside bunkers rebuilt; the general manager said the greens would keep the original Ross contours. On the 6th an added centre approach bunker was removed and five bunkers restored from remnants of the original course.
Sources: Richmond BizSense, 'At 96, it's time for a facelift' · Kris Spence, Golf Club Atlas, 'Donald Ross' Cross-Bunkered Par-3s', reply #34 · Top100GolfCourses, Lakeside Park
CompletedFrom 2012
Cincinnati, OH
Greens, bunkers, tees, fairways and trees
Brian Silva
Described as a restoration by Golf Course Architecture
First phase of Brian Silva's master plan, commissioned in 2010. Work on holes 2, 4, 5 and 10 with tree removal: the 4th became a long par 4 with new fairway and greenside bunkering, the 10th green was moved about 50 yards further up and to the left, into the hillside, and the 5th gained a new back tee.
Sources: Golf Course Architecture, Brian Silva completes Ross restoration at Maketewah · Golf Club Atlas forum, Changes at Maketewah Country Club
Completed2012
Memphis, TN
Bunkers and tees
Kris Spence
Described as a restoration by the architect and Golf Course Architecture
First phase of Kris Spence's master plan, hired in 2010: tees and bunkers rebuilt. Spence dates the phase to 2011; Golf Course Architecture reported it complete in 2012.
Sources: Kris Spence Golf Design, Memphis Country Club · Golf Course Architecture, Kris Spence completes restoration of historic Memphis CC course
Completed2011–2012
Boardman, OH
Bunkers, tees, fairways and routing
Brian Huntley of Brian Huntley Golf Sense, Inc.
Described as a renovation by The Vindicator (2012) and golf director Dennis Miller
To fit a new practice range between the two holes, the 10th tee was moved about 20 yards north and the 18th fairway shifted about 20 yards south. The 18th kept its yardage but lost its sharp dogleg, gained a bunker and brought a creek into play on its south side.
Sources: The Vindicator, "Mill Creek North course about to be tweaked" · The Vindicator, "Exciting year still going at Mill Creek" · The Vindicator, "Practice range at Mill Creek Park Golf Course to open next week"
Completed2012
Pittsford, NY
Tees
Gil Hanse
Gil Hanse shaped a new 17th tee and an exit area from the 16th green and staked out a championship tee on the 2nd.
Source: Monroe Golf Club, Club History (golf course timeline)
Completed2010–2012
West Orange, NJ
Bunkers
Rees Jones, Bryce Swanson (associate)
Described as a redesign by Rees Jones, Inc.
Rees Jones rebuilt the fairway and greenside bunkers with new sand, moving some into play, working through the club's nines in phases. Much of this was reworked again in the Renaissance restoration from 2020.
Source: Rees Jones, Inc., Montclair Golf Club
Completed2012
West Caldwell, NJ
Bunkers, tees, fairways and trees
Ron Prichard
Described as a restoration by the club
Fairways were significantly widened in winter 2011-12. On the 13th the cross brook was piped and the stream from the 12th rerouted diagonally through the fairway; on the 12th three corner pines were removed, the stream extended and bunkers added or returned; on the 15th the corner oak came down and the left bunker moved back 25 yards; the 14th gained a new championship tee.
Sources: Mountain Ridge Country Club, Course Tour holes 12-15 · Top100GolfCourses, Mountain Ridge · AmateurGolf.com, USGA Senior: Mountain Ridge up for challenge
Completed2011–2012
Duluth, MN
Greens and trees
Ron Prichard (consultant), Northland Turfgrass Staff (in-house)
First phase of the Ron Prichard master plan, approved by the membership in September 2011, carried out almost entirely by the turf staff. Trees were removed on several holes to open lake views, recover architectural features and improve turf, and every collar was narrowed to 21 inches so the putting surfaces were pushed out to their edges, with resodding in spring 2012.
Sources: Northland grounds blog, 'Master Plan Implementation-Fall Tree Work' · Northland grounds blog, 'Tree Removal Update and Photos' · Northland grounds blog, '21-inch Collars' · Northland grounds blog, 'Sodding Green Perimeters'
Completed2012
Pittsburgh, PA
Greens and bunkers
Keith Foster
Described as a renovation by Pittsburgh Post-Gazette (Gerry Dulac) calls it a bunker renovation; Top 100 Golf Courses calls it 'a restoration project of sorts'
Keith Foster renovated the bunkers and reshaped the green complexes. Sources give no hole-by-hole scope or cost.
Sources: Gerry Dulac, 'Dulac on Golf', Pittsburgh Post-Gazette (syndicated copy) · Wikipedia, Pittsburgh Field Club · Pittsburgh Field Club, About Us (architect list)
CompletedFrom 2011
Windsor, ON
Bunkers
Paul Albanese, TDI Golf (builder)
Described as a restoration by Golf Course Architecture and the architect
Paul Albanese led a remodelling of the course's bunkers, which he said had changed over the years through time and erosion; the greens were described as untouched. The City of Windsor approved C$1 million for the work and TDI Golf built it.
Source: Golf Course Architecture, Ross restoration at Ontario course
Completed2012
Greensboro, NC
Greens and bunkers
Kris Spence, McConnell Golf
McConnell Golf had Kris Spence convert all greens from bentgrass to Champion Bermuda. Spence enlarged the 2nd green at the back, modified the front of the 17th green, added two bunkers back right and one front left at the 5th and one behind the 15th green; the area left of the 15th green became heavy rough.
Sources: The Golf Wire, Sedgefield 2.0 · Golf News Net, Clark: New Sedgefield greens should change scoring · Bradley S. Klein, PGA TOUR, Five things to know: Sedgefield Country Club (dates the regrassing to 2010)
Completed2011–2012
Springfield, OH
Greens, bunkers, tees, fairways and trees
Ron Forse, Jim Nagle (associate), Chad Dorrell (in-house)
Described as a renovation by Brian Hoover, Golf Club Atlas photo tour (2014)
Ron Forse of Forse Design rebuilt the 4th, 8th and 18th greens to reduce their contour and recover hole locations, and 45 bunkers were rebuilt to their original depth and shape with drainage and liners. Some tees were renovated, greens were stripped of organic build-up and had lost corners reclaimed, trees were removed and fairways returned to their original width; tree removal continued, passing 500 trees by 2016.
Sources: Golf Course Architecture, Reshaped greens at Ross course · Golf Club Atlas, Springfield CC photo tour (Hoover, Nagle) · Golf Club Atlas, Springfield CC photo tour page 2 (Nagle on the greens rebuild)
CompletedFrom 2012
White Bear Lake, MN
Fairways and trees
Jim Urbina Golf Design (consultant), John Steiner (in-house)
Described as a restoration by Golf Club Atlas (Ran Morrissett)
In-house work guided by Jim Urbina with greenkeeper John Steiner re-presented the mow lines, extending fairways out to the fairway bunkers and adding short grass around many greens, including the 9th, 12th and 15th. By 2015 the focus had widened to restoring vistas, such as the view of the 3rd green from the 2nd. Golf Club Atlas reports most of it done by fall 2017, with the 9th fairway widened again afterwards.
Source: Golf Club Atlas, Ran Morrissett, White Bear Yacht Club course profile
Completed2012
Winchester, MA
Greens and bunkers
Ron Forse, Dennis Houle (in-house)
Described as a renovation by Top100GolfCourses ('bunker renovation')
Ron Forse and superintendent Dennis Houle renovated all 81 bunkers. The work also recaptured green edges, which a 2013 Golf Club Atlas photo tour put at about 20 percent more putting surface, including a restored front tier on the 10th and an expanded left half on the 11th.
Sources: Top100GolfCourses, Winchester (MA) · M. James Ward, Grade A Architecture: Winchester Country Club, Golf Features · Golf Club Atlas forum photo tour, Winchester Country Club (Ross / Forse)
Completed2011
Jacksonville, FL
Greens, bunkers, tees, fairways and trees
Bobby Weed (consultant), Chris Neff (in-house)
Described as a renovation by Golf Course Trades (from jacksonville.com)
All 18 tees and greens and 14 fairways were regrassed with Bermuda varieties and the 82 bunkers were reworked, with none added or removed. A member later added that some trees were removed and a few tees modified.
Sources: Golf Course Trades, Area Golf Notebook: Timuquana course to be renovated this summer · Golf Club Atlas, Timuquana CC - Ross gem with pictures · Top100GolfCourses, Timuquana
Completed2011
Absecon, NJ
Bunkers and fairways
All bunkers on the Bay Course were to be rebuilt, fescue mounds along the fairways returfed and drainage improved in key spots, as part of a $1.4 million resort-wide project that also covered the Pines.
Sources: Golf Course Architecture, 'Upgrade planned for NJ Ross course' · Club & Resort Business, 'Golf course reopens at Seaview Resort' · Seaview - A Dolce Resort press release, '"New Look" Golf Experience Debuts For 2011 Season'
Completed2011
Glens Falls, NY
Trees
Ian Andrew (consultant)
Six evergreens about 50 feet tall on the far wall of the valley shared by the 2nd and 12th holes were removed, reopening the view from the 2nd tee to the 12th green and letting light onto the shaded, damp 2nd fairway.
Source: Golf Club Atlas, Glens Falls course profile (Ran Morrissett)
Completed2011
Clarksville, VA
Greens
Described as a renovation by the club ('the renovation of the greens')
The greens were replanted from bentgrass to MiniVerde ultradwarf bermudagrass, and an automated irrigation system replaced the original hand-operated system. The club says many greens kept their original clay base.
Source: Kinderton Country Club, About the Course
Completed2011
Toronto, ON
Greens, bunkers, tees and routing
Rees Jones
Described as a renovation by Rees Jones, Inc.
Final phase of the Jones master plan: the tennis clubhouse was relocated so the 17th and 18th could be reversed, making the 17th a long par 3 and the 18th a dogleg-left par 4. The Valley Course was completed in the same phase.
Sources: I LAMBTON Issue 3, Brent Long, "Rees Jones Leaves His Mark" · Rees Jones, Inc., "Rees Jones Successfully Renovates One of Canada's Oldest Clubs"
Completed2011
Tampa, FL
Greens, bunkers, fairways and trees
Bobby Weed Golf Design, MacCurrach Golf
Described as a renovation by ASGCA and Golf Inc. (Renovation of the Year); Weed's 2025 release calls it the phase I restoration
Fairways were turned to a six-foot depth and a new drainage system tied into the city storm sewer; irrigation was replaced. Greens were enlarged and rebuilt in TifEagle, bunkers rebuilt and repositioned with new fairway bunkers at 285-300 yards, trees thinned and 14 acres of rough converted to pine straw. Walker Thomas credits Weed with the 6th's long bunker and the 18th's pot bunker.
Sources: ASGCA, Palma Ceia ... awarded Renovation of the Year from Golf Inc. · Bobby Weed Golf Design, Palma Ceia project page · Walker Thomas, A Walkthrough of Palma Ceia, Golf Club Atlas · GolfPass, Palma Ceia Golf & Country Club (MacCurrach credit)
Completed2010–2011
Pinehurst, NC
Greens, bunkers, tees and fairways
Bill Coore and Ben Crenshaw
Described as a restoration by the club (Pinehurst Resort)
Fairways widened by up to 50 percent, all rough and 35 acres of irrigated turf removed in favour of sand, wiregrass and pine straw, and 650 irrigation heads eliminated. Bunkers were restored, removed or reshaped from 1940s aerial photographs, 13 championship tees were added, and the 15th and 17th greens were modified slightly to recover hole locations.
Sources: Pinehurst, The Pinehurst No. 2 Restoration – A Hole-by-Hole Tour · AP, Facelift on No. 2 hole at Pinehurst done · Golf Club Atlas, Pinehurst No. 2
Completed2009–2010
Athens, GA
Greens and tees
Ron Forse
Described as a restoration by Top100GolfCourses
Ron Forse's two-year restoration enlarged shrunken greens and rebuilt them to Ross's drawings, fixed fairway and greenside drainage and lengthened several holes.
Sources: Top100GolfCourses, Athens · Athens Country Club, About Us
Completed2009–2010
Bethesda, MD
Greens, bunkers, tees and fairways
Rees Jones
Described as a redesign by Rees Jones, Inc.
Before the 2011 U.S. Open, all 18 greens on the Blue Course were rebuilt to USGA specifications and converted from poa annua to bentgrass, keeping Rees Jones's 1989 contours with small changes to add hole locations. New championship tees were added, including about 50 yards on the 18th, and fairway bunkering was reworked on the 11th and 16th.
Sources: Rees Jones, Inc., "Congressional Country Club Blue Course redesign summary, 1989 to 2010" · Associated Press, "USGA debuts longer, tougher Congressional" (Fox Sports)
Completed2010
Detroit, MI
Greens and bunkers
Bruce Hepner
Described as a renovation by The Fringe
As the club prepared to host the PGA Tour, Bruce Hepner led work on the South's greens and bunkers. Tom Doak characterizes it as a retouching rather than a rebuild. Dates uncertain: sources say only "the 2010s"; 2010 is when Hepner left Tom Doak's Renaissance Golf Design to found Hepner Golf Design.
Sources: Gabe Ziskin, "PGA DFS preview: Rocket Classic and Detroit Golf Club," The Fringe · Top100GolfCourses, Detroit (South)
Completed2009–2010
Toronto, ON
Greens, bunkers, tees, fairways, trees and routing
Rees Jones, Keith Evans, design associate (associate)
Described as a renovation by the club ("a significant renovation"); Rees Jones, Inc. ("renovates")
Phase one of a master plan for all 27 holes: holes 1 to 16 of the Championship Course rebuilt with enlarged USGA-standard greens and new bunkers, the old par-3 2nd removed and the 1st combined with it, the former 3rd and 4th moved west away from Scarlett Road, and a new par-3 5th built beside a new irrigation reservoir. Trees were removed and replaced three for one; Valley Course holes 1-4 and 9 and the practice areas were also redone.
Sources: Lambton G&CC, History Timeline 1902-2022 · Turf & Rec, Mike Jiggens, "Multi-million dollar makeover has Lambton G&CC back in play after year-long shutdown" · The Globe and Mail, Lorne Rubenstein, "Lambton's storied history" · Rees Jones, Inc., "Rees Jones Successfully Renovates One of Canada's Oldest Clubs"
CompletedFrom 2010
Highland Park, IL
Greens, bunkers, tees, fairways and trees
J. Drew Rogers, Curtis James, superintendent (in-house)
Described as a restoration by the architect (J. Drew Rogers)
Tree removal to reopen playing corridors, followed by fairway widening, realignment of tees and recovery of the original green outlines and hole locations. Several original cross bunkers that had been covered over were recovered in 2010, and in 2011 a non-original bunker right of the 17th green was removed and the hillside reshaped as a kick plate.
Sources: J. Drew Rogers, Old Elm Club project page · Golf Course Architecture, A legendary collaboration at Chicago's Old Elm Club · Top100GolfCourses, Old Elm Club
Completed2009–2010
Palm Beach, FL
Greens
Brian Silva
Described as a renovation by Andrew Mack, Golf Club Atlas (Bamberger's 2012 Golf.com article called the design 'restored by Brian Silva')
A course-wide renovation by Brian Silva over Ross's routing, which Andrew Mack described as producing largely a new course. The 4th green was lowered, with coral blasted out, and given a backstop.
Sources: Andrew Mack, 'Palm Beach CC (Ross 1917) - The Course Before 2010', Golf Club Atlas · Geoff Shackelford, quoting Michael Bamberger (Golf.com) · The Boca Raton, Golf FAQ
Completed2010
Toronto, ON
Greens, bunkers, tees and trees
John Fought
Described as a restoration by Top100GolfCourses and Golf Course Gurus
John Fought worked from a 1939 aerial photograph laid over a plan of the existing course. Trees were thinned, tees adjusted, bunkers restored or removed and several greens rebuilt. Top100 dates completion to 2010; ASGCA described the work as ongoing in spring 2015.
Sources: Top100GolfCourses, Rosedale Golf Club · ASGCA By Design, Spring 2015, p.15 · Golf Course Gurus, Rosedale Golf Club review
CompletedFrom 2006
Salem, MA
Greens, tees, fairways and trees
Robert McNeil, Northeast Golf Company, Country Golf Inc, led by Jerry and Jim Demers (builder), John Eggleston, golf course superintendent (in-house)
Described as a renovation by Golf Course Architecture (2022 headline); McNeil calls the work restorative
A phased program under consulting architect Robert McNeil that began after a gas line was laid through several holes. It removed 800 to 1,000 trees, restored fairway grassing lines, expanded green perimeters, added mown catchment and pitch areas, restored the 4th tees and the 9th plateau green, and built new tees including a new first tee complex.
Sources: Golf Course Architecture, Richard Humphreys, "Robert McNeil completes Ross-inspired renovation at Kernwood", 2022-01-17 · Golf Course Architecture, Richard Humphreys, "Robert McNeil nears completion of bunker restoration at Kernwood CC", 2020-11-23 · Salem News, Gary Larrabee, "Reading The Greens golf column: Kernwood restoration project 'has turned out awesome'", 2022-06-22
CompletedFrom 2005
Rome, NY
Greens, bunkers, tees, fairways and trees
Barry L. Jordan, Jordan Golf Design
Described as a restoration by the architect (Barry Jordan), the club's 2004 master plan, Golf Course News
A phased restoration under Barry Jordan's December 2004 Long Range Master Plan: greens expanded to original shapes, about two hundred trees removed, fairways widened, original bunkers rebuilt, missing ones reconstructed and unoriginal ones filled, with tee work and a burn planned on the 11th. Work began in fall 2005 and was still described as ongoing in 2014; its completion date is not settled.
Sources: Barry L. Jordan, Teugega Country Club Golf Course Long Range Master Plan · Golf Club Atlas forum, Teugega CC (Ross) to be restored (quoting Golf Course News) · Jay Flemma, Cybergolf photo essay of Teugega (Part 1) · Golf Club Atlas forum, Jay Flemma, Ross's Teugega photo essay (Jordan quotes) · BuffaloGolfer.com, A Wee Review of Teugega Country Club
Completed
Hagerstown, MD
Course work
Forse Design
Described as a restoration by Forse Design (client list: 'RE' = Restoration)
Forse Design lists a master plan and restoration at Fountain Head among its previous work of 2010 to 2019. The firm gives no year, scope or holes, and no club or press account of the work has been found.
Source: Forse Design, client list ('Previous Work: 2010 – 2019')
Completed
Franklin, MI
Course work
Andrew Green
Described as a renovation by a Top100GolfCourses reviewer
A reviewer reports that the course recently went through a phased renovation by Andrew Green, who the GAM said in 2021 was preparing a master plan for the club; the same reviewer notes that it did not go overboard with tree removal. No club, architect or press source gives dates, holes or scope. A 2025 reviewer wrote that the greens "now have very nice topography and pin placement options."
Sources: Top100GolfCourses review by 'Golferm' · Golf Association of Michigan preview of the 100th GAM Championship (republished by GolfBlogger) · Top100GolfCourses review by 'Abraham Lincoln'
Completed
Hyde Park, MA
Bunkers and tees
Mark Mungeam
At the 6th, Mungeam was redesigning the tee in July 2021 (Golf Course Architecture). The Fried Egg's November 2024 profile says the hole "received an upgrade two years ago": Mungeam removed two non-original fairway bunkers on the right and reshaped the remaining left fairway bunker. No source gives a year for the bunker work or a completion date for the tee, so no completion date is recorded (a relative 'two years ago' is not a year-precision date). Whether the redesigned tee moved the hole's line is not reported.
Sources: Golf Course Architecture, Mark Wagner · The Fried Egg, Garrett Morrison
Completed
Golf, IL
Course work
Jim Urbina
Described as a restoration by the club
The club says it contracted Jim Urbina in 2013 as its golf course partner and that most of Flynn's original design elements have been restored. No source opened for this refresh gives the work by hole or its construction dates.
Source: About Glen View Club (club head professional's page)
Completed
Linville, NC
Greens, bunkers and tees
Bobby Weed Golf Design
Described as a restoration by the architect ("restore eroded features")
A long consultancy that began in the mid-1990s and ran for more than two decades. It added and re-levelled tees, lengthening the course to nearly 7,000 yards, rebuilt the irrigation, drainage and bunkers, and softened a few greens.
Source: Bobby Weed Golf Design, Linville Golf Club project page
Completed
Glenside, PA
Tees and trees
Superintendent Matthew Stout (in-house)
The club removed hundreds of trees and added tee boxes in the roughly three years before February 2019, opening the playing corridors. PhilaGolf credits the course's condition to head professional Jon Rusk and superintendent Matthew Stout.
Source: PhilaGolf, "Like a Ross: LuLu Country Club"
Completed
Westerly, RI
Bunkers
Bruce Hepner
Described as a restoration by Golfadelphia
Bunker restoration led by Bruce Hepner. Golfadelphia dates the project to 2015 and GolfPass lists Hepner's work as 2011; no source gives its extent.
Sources: Golfadelphia, The Misquamicut Club · GolfPass, Misquamicut Club (architect list)
Completed
West Orange, NJ
Greens, bunkers, tees and fairways
Brian Schneider of Renaissance Golf Design, Michael Campbell (in-house)
Described as a restoration by the club
Phase III on the Second Nine, scheduled to begin in late July 2021, applied the same scheme of wide fairways, corrected bunkers and grass lines, enlarged green perimeters and new tees. Across the Second and Third Nines six greens were rebuilt in all and twelve expanded to their original pads.
Sources: Club release via First Call Golf (start late July 2021) · Golf Today, Ward, Finicky Golfer · Montclair Golf Club, Club History
Completed
Muskegon, MI
Trees
Tree removal aimed at returning the course to the setting Ross created. The club says Brad Klein walked the property in 2011 and advised on getting the course back to its original setting. A 2015 forum post put the number of trees removed at 3,000; GAM releases in 2017 and 2022 still describe it as recent.
Sources: Muskegon Country Club, The Course page · Golf Club Atlas forum, 'Muskegon CC' (BCowan, 7 Oct 2015) · GolfBlogger / GAM release, 31st GAM Senior Championship preview · GolfBlogger / GAM release, GAM Senior Match Play preview
Completed
Charlotte, NC
Greens, bunkers and trees
Richard Mandell Golf Architecture
Described as a restoration by the architect (Richard Mandell Golf Architecture)
Richard Mandell's firm, which prepared a renovation business plan and master-planning options for the club in 2014, restored flashed-sand bunkers, removed selected trees and features it judged historically inaccurate, and later rebuilt two greens and the practice facility. The firm does not name the holes or give completion dates.
Sources: Richard Mandell Golf Architecture, Classic Renovation & Restoration · Richard Mandell Golf Architecture, Myers Park Documents · Two Down Press, Renovation Roundup
Completed
Highland Park, IL
Greens, bunkers and fairways
Zinkand Golf Design, David Zinkand, Curtis James (in-house)
Described as a restoration by the architect (Zinkand Golf Design) and Golf Course Architecture
Multi-year restoration of Colt's bunkering from his sketches and notes, carried out alongside a regrassing of the whole course, including the greens, and a further expansion of fairways. Six greens, including the Redan 17th, received subtle contour modifications. Completion was announced in February 2025; the finish date of construction is not published.
Sources: Zinkand Golf Design release via The First Call · Golf Course Architecture, Zinkand completes restoration of bunkering at Old Elm · Fried Egg Golf, Chocolate Drops: Dave Zinkand Wraps Up Work at Old Elm Club
Completed
Pocasset, MA
Greens, bunkers and tees
Ron Forse
Described as a restoration by Mass Golf ("comprehensive restoration"); the club homepage says "totally restored over the past five years"
Reconstruction of every bunker and every tee on the course, with numerous green-site enhancements, guided by Ron Forse under the club's long-term master plan. A new irrigation system was installed the year before completion.
Sources: Mass Golf, Pocasset Golf Club Selected To Host 118th Massachusetts Open Championship · Pocasset Golf Club home page
Completed
Sarasota, FL
Bunkers, tees and trees
Kris Spence
Described as a restoration by the club ("ongoing restoration" under Spence's master plan)
The club's December 2025 release lists new bunkers and tees, upgraded cart-path bridges and tree removal (some for the renovations, some after hurricanes) among recent improvements under Spence's master plan. No dates or holes are given.
Source: Sara Bay CC release, Restoration of historic Donald Ross course continues as part of master plan
Completed
Osterville, MA
Bunkers and trees
Hanse Golf Course Design (consultant)
Described as a renovation by Mass Golf ('bunker renovation and tree removal' to 'restore original design features')
Bunker renovation and tree removal on the 2nd, 8th and 13th through 17th, which Mass Golf described in June 2025 as recent work aimed at restoring original design features. It forms part of the Hanse Golf Course Design master plan in place since 2012; the source does not credit this phase to a named architect.
Sources: Mass Golf, "Women's Stroke Play Championship: 75th Playing Of Baker Trophy Returns To Breezy Seaside Setting At Wianno Club" · Hanse Golf Course Design, "The Wianno Club" (Golf Course Master Plan - Ross, 2012 - Ongoing) · Hanse Golf Course Design, Restoration Projects